Gm For 55 Mw Power Plant - Ambikapur , Chhattisgarh

Gm For 55 Mw Power Plant - Ambikapur , Chhattisgarh

31 Jul
|
Vinayak Outsourcing Works
|
Ambikapur

31 Jul

Vinayak Outsourcing Works

Ambikapur

Job Description:

A General Manager (GM) for a 55 MW power plant oversees all strategic and daily operations, ensuring continuous power generation, safety compliance, and cost efficiency. Key tasks include managing Plant Load Factor (PLF), supervising mechanical and electrical teams, overseeing plant maintenance, and optimizing fuel consumption. [1, 2, 3, 4, 5, 6] A complete breakdown of the role includes the following core areas: 1. Key Responsibilities

- Operations Management: Direct day-to-day operations of the 55 MW plant, including Boilers, Turbines, and Balance of Plant (BOP) to ensure uninterrupted power delivery. [1, 2]
- Maintenance & Reliability: Spearhead preventive, predictive, and breakdown maintenance. Plan annual shutdowns and lifecycle upgrades to extend asset lifespan. [1, 2, 3, 4]
- Budget & Cost Control: Prepare and manage site expenditures, operational budgets, and fuel costs to ensure the cost of generation remains highly competitive. [1, 2, 3]
- Compliance & Safety: Enforce stringent health, safety, and environmental (HSE) protocols. Ensure all operations adhere to local, state, and national electrical and boiler inspectorate guidelines. [1, 2]
- Team Leadership: Manage cross-functional teams of engineers, operators, and technicians. Foster a productive,



safety-focused culture and facilitate targeted training. [1, 2]

2. Qualifications & Experience
- Education: Bachelor’s Degree in Electrical or Mechanical Engineering (Post-graduate in Engineering or Business Management is a robust plus). [1]
- Experience: Typically 20+ years in power plant management, with at least 5-8 years in a senior leadership role (Plant Head / General Manager) handling capacities above 20 MW. [1, 2, 3, 4]
- Certifications: Holding a valid Boiler Operation Engineer (BOE) certification is highly preferred. [1, 2, 3, 4]
- Technical Skills: Deep expertise in Distributed Control Systems (DCS), turbine governing systems, and power distribution networks. [1, 2, 3]

3. Performance Metrics A successful GM is evaluated on strict Key Performance Indicators (KPIs):
- Plant Load Factor (PLF): Maximizing the efficiency and output of the 55 MW capacity.
- Forced Outage Rate: Minimizing unplanned downtime.
- Specific Fuel Consumption (SFC): Optimizing the coal, gas, or biomass required to generate a megawatt of power.
- Safety Incidents: Maintaining a zero-harm workplace. [1, 2, 3, 4]

JOB APPLY
http://jobs.vinayakjob.com/
CONTACT DETAILS -
Name - MANISHA SAHU
Number - 91099 93513

📌 Gm For 55 Mw Power Plant - Ambikapur , Chhattisgarh
🏢 Vinayak Outsourcing Works
📍 Ambikapur

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: gm for 55 mw power plant - ambikapur , chhattisgarh / ambikapur

Subscribe to this job alert:

Get the latest job offers by email for: gm for 55 mw power plant - ambikapur , chhattisgarh / ambikapur