To manage and control the production of the winding so as to meet the agreed production targets within planned levels of cost Product quality in protected working production in winding as well as yarn management
Job Context & Major Challenges
Maintaining the flow from PPC for yarn stockage for continuous beam running is a challenge
Full Machine utilization is a challenge because of manpower shortage
Accurately maintaining the drawing accessories for yarn processing
Running after production for urgent sales orders.
Key Result Areas
KRA (Accountabilities) (Max 1325 Characters) Supporting Actions (Max 1325 Characters)
KRA1 Planning for Preparation and Processing Ensuring the required stock of yarn for processing
Planning for no beam loss for achieving full utilization of looms
Planning for maintaining the required Getting/Knotting
Optimization of piece dyed yarn remnant for full utilization of yarn.
KRA2 Planning for Order Delivery Ensuring the TAT of all BNR orders is achieved
Planning for on time monthly delivery for all sales orders
KRA3 Reduction of beam setting time Analysis of Beam runout.
Prior arrangement of Beam runout.
Arrangement of Hands and timely changing of the beam.
KRA4 Completion of maximum nos. of gaiting and knotting On time execution of beaming gaiting.
On time calculation of possible knotting and gaiting and arranging knitters and gaiters accordingly.
KRA5 To improve housekeeping and ascertain safety standards to reduce accident Abnormality to be sorted out to take action.
Imporve in the 5 S score.
KRA6 To follow the guide line of WCM at implementing ISO-14000 identify current project at follow of OHSAS 18001 & SA 8000 Analyzing of root cause of deficiency & undertaking of current project training of all operators in respective shift during WCM meeting for ISO- 14000