01 Aug
|
Lotus Technicals
|
Maharashtra
01 Aug
Lotus Technicals
Maharashtra
Technical:
1.To work on conceptual design, basic design, and detailed engineering of industrial projects in
electricals and instrumentation.
2.To work on power load calculations based on equipment loads related to heating, ventilation, and air
conditioning (HVAC), process equipment, utility equipment, lighting, etc.
3.To work on basic electrical schemes starting with the transformer up to the point of use and
represent the same in a Single Line Diagram (SLD).
4.To perform equipment sizing and selection related to electrical systems based on load sheets and
SLDs, including transformer sizing, Diesel Generator (DG) set sizing, busbar sizing, and panel
sizing.
5.To prepare detailed control and power panel SLDs as per schemes agreed upon with the client and
Project Management Department.
6.To prepare cable schedules and determine switchgear ratings based on voltage drop calculations.
7.To perform lighting calculations based on lux levels and working environment requirements.
8.To work on DIALux software.
9.To work on lightning arrestor design and earthing design, including routing, grids, and pits.
10.To work on cable tray sizing based on cable routing and cable loads.
11.To work on instrumentation systems related to Supervisory Control and Data Acquisition (SCADA),
Building Management System (BMS), operation of utilities, and HVAC systems.
12.To organise the Bill of Quantity (BOQ) along with proper backup costing and quotations from vendors
for all components.
13.To prepare technical specifications and data sheets for all electrical components and equipment
typically used in industrial projects.
14.To check and approve Remote Control Panel (RCP), switch socket locations, and light switch
locations on layouts.
15.To complete all technical documentation needed for procurement, delivery, and installation of
components at the site, like design data, technical specifications, design qualification, construction
drawings, typical drawings, etc., involving vendor coordination.
16.To coordinate with the Project Management Department on various site-related issues, troubleshoot
them, and provide technical solutions within reasonable timelines along with proper documentation.
17.To maintain timelines for work allotted as per schedules set by Project Management Department and
the client.
Supervisory Responsibilities:
1.To assign workloads to team members as per project requirements and timelines.
2.To coordinate with the Project Management Department regarding client queries and submission of
documents.
3.To check and approve workloads of subordinates and colleagues for accurate submission of
documents required for procurement, client approvals, and site construction activities.
4.To control and monitor the work hour reports of each team member and take corrective actions
based on discrepancies identified.
5.To resolve technical and team-related queries as and when required.
6.To maintain amicable working relationships among subordinates and colleagues to improve
productivity at work.
7.To resolve issues and problems as per project and departmental requirements.
8.To prepare and monitor KRAs for team members and update them regularly.
9.To monitor own KRA requirements and update them regularly for further discussion with the
reporting manager (RM).
10.To review and approve work submitted by team members.
11.To provide input on team members overall performance during appraisals, contributing towards
salary increment recommendations.
12.To assist in the departmental manpower planning and hiring processes.
Skills and Competencies:
1.Thorough knowledge of electrical calculations and technical concepts.
2.Thorough knowledge of equipment selection.
3.Fluent in written and spoken English and Hindi.
4.Self-motivated and target-oriented.
5.Robust analytical skills.
6.Good negotiation and vendor management skills.
7.Ability to perform under pressure and meet strict deadlines.
8.Strong problem-solving skills.
9.Strong capability in the design of electrical systems for industrial projects.
10.Good coordination and team management skills for handling multiple project requirements
simultaneously.
Knowledge:
1.Familiarity with Low Tension (LT) Power design and High Tension (HT) Breaker design before the
transformer.
2.Familiarity with AutoCAD and the ability to work on it when required.
3.Familiarity with National Electrical Manufacturers Association (NEMA) standards and other
guidelines related to electrical engineering and design.
4.Deep understanding of low and medium voltage (LV/MV) systems and load calculations.
5.Good knowledge of safety codes and regulatory standards.
6.Understanding of industrial project execution, coordination, and site installation practices.
Preferred Knowledge:
1.Preferably visited project sites at different stages for monitoring project progress.
2.Preferably worked on pharmaceutical engineering projects.
If interested visit www.lotustechnicals.com-->Careers--> Job Openings--> Asst. Manager-Electrical--click on "I am Interested"
📌 Asst. Manager- Electrical (Maharashtra)
🏢 Lotus Technicals
📍 Maharashtra