Job Description

Key Responsibilities

1) Planning & Coordination

- Interpret issued-for-construction (IFC) drawings, formwork shop drawings, and pour plans; develop method statements and work packs for each block/lift.
- Prepare daily/weekly look-ahead plans (materials, workforce, equipment) synced to concrete pour schedules and rebar readiness.
- Define formwork systems (traditional timber, modular steel/aluminum, climbing/slide forms, custom curved forms) based on structural geometry (spillway/chute, dam blocks, galleries, draft tubes, piers).
- Coordinate interfaces with rebar, embeds/inserts, water-stops, construction joints, cooling pipes, instrumentation and embedded metals.
- Plan lift heights, staging/scaffolding, access, and erection/dismantling sequences to optimize cycle time and safety.

2) Technical Execution

- Lead erection, alignment, plumb, level, and curvature control per drawings; ensure camber/offsets where specified.
- Calculate and verify formwork pressures (rate of pour, concrete temperature, slump) and select adequate ties, walers, studs, bracing.
- Ensure form-release agents, surface preparation, joint sealing, and form tightness to prevent honeycombing and leakage.
- Implement thermal control measures (cooling pipes coordination, insulation, pour temperature limits) to maintain joint integrity and reduce thermal cracking.




- Oversee pre-pour inspections with QA/QC; close NCRs/snag lists; maintain as-built adjustments logs.

3) Safety, HSE & Compliance

- Enforce HSE method statements, Job Hazard Analysis (JHA), and Permit-to-Work for all formwork activities—especially at height, near water, night pours, and heavy lifts.
- Ensure scaffolding/working platforms are certified; maintain fall protection and restricted access during pour.
- Conduct toolbox talks, PPE checks, and lifting plan briefings; coordinate with lifting supervisor for panel handling and crane operations.

4) Quality Assurance & Control

- Ensure dimensional accuracy: line, level, plumb, elevation, curvature/geometry for spillway/chute profiles; form alignment tolerance per project specifications.
- Verify construction joint preparation, keys, and waterstops placement; ensure embedment tolerances for anchors/inserts.
- Document pre-pour / post-pour checklists, inspection requests (IRs), and maintain redline/as-built records.

5) Resource & Cost Management

- Track material inventories (plywood/ply board, steel/aluminum panels, H‑frames, props, ties, clamps, walers, consumables).
- Control formwork damage rates, repair cycles, and reuse factor; reduce wastage and optimize procurement.
- Manage workforce productivity and equipment utilization (cranes, vibrators, power tools).
- Support cost control with accurate Material Take-Off (MTO) and consumption reporting.

6) Documentation & Reporting

- Issue daily progress reports (erection/dismantling, inspections, pour readiness) and weekly performance dashboards.
- Maintain RFI/Clarification logs with design/engineering; track NCRs and Corrective Actions.
- Keep equipment/inspection/maintenance records for formwork systems and accessories.

📌 Formwork Incharge (India)
🏢 Larsen and Toubro
📍 India

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: formwork incharge (india) / india

Subscribe to this job alert:

Get the latest job offers by email for: formwork incharge (india) / india