- Project Name & Client :Construction Of Proposed Doubling of Track between Ankai Station(excluding) at Km 16.00 (Ch. 16000) & Karanjgaon Station (excluding) at Km. 69.01(Ch 69010) [i.e., (53.01 Km)] and between Karanjgaon Station (including) at Km. 69.01(Ch 69010) & Aurangabad Station(including) at Km 113.15(Ch 113150) [i.e., (44.14 Km)] including Electrification and Signaling Works in connection with Aurangabad-Ankai Doubling Project in Nanded Division of South Central Railway.
Position-Project Manager/Resident Engineer-Civil
Qualification and Experience- Graduate Degree in Civil Engineering with minimum of 15 years’ experience after degree in construction industry including Railway Track Doubling and Construction Projects for a minimum period of 3 years.