- Conduct inspection of components during production (CNC/VMC machines).
- Verify dimensions as per drawing and control plan.
- First piece approval before batch production.
- Patrol inspection on shop floor.
2. Final Inspection
- Perform final dimensional inspection before dispatch.
- Check visual defects (cracks, burrs, dent, surface finish).
- Maintain inspection reports and records.
- Maintain inspection report.
- Fill in-process check sheet.
- Update rejection data.
- Support in PPAP / control plan documentation.
5. Rejection & Quality Control
- Identify defective parts.
- Segregate rejection material.
- Inform production supervisor about quality issues.
- Support root cause analysis.
- Work closely with Production, PPC, and Dispatch.
- Follow ISO / IATF quality standards (if applicable).