- Responsible for Top to Bottom-line activities of the material requirement planning activities.
- Calculate the Materials accurately as per drawing details.
- To ensure material consumption is in productive manner
- To arrange the raw materials requisition on time without hampering the production activities
BOM & BOQ - (JOB CARD)
- Preparation of Job card (Calculation of Raw materials) for all the drawings and circulate internally.
- Entry of job card in ERP
- Prepare the Purchase Requisition as per drawing & update it as per drawing revision periodically as per ERP processes. Circulate the same internally.
- Engineering Change notes / modification of job card / Purchase requisition as per latest drawing revisions. Timely Updation of same & circulate to all the respective departments.
- Stage wise & after Completion of Job Material Consumption checking with Job Card.
- Preliminary Material Calculation as per discussion with Design & Sales Department at the enquiry/ pre ordering stage as and when required.
- Proper Co Ordination with Design & Drawing department related for BOM & BOQ calculation purpose, based on lay-up sequences in consultation with design team.
Coordination with Stores
- Periodical site/factory visits for the checking of Material Consumption history.
Coordination with Production
- Coordination with production team for timely & precise raw material & Bought out items calculations & clarifications to be provided as applicable.
Reporting
- Submit Authentic, Accurate and Timely Reports as per following
- Preparation of Job card & Purchase Requisition in ERP.
- Daily report of Daily activities to be shared to Technical Manager.
- Material consumption chart on monthly basis in consultation with stores team , as per actual after completion of job.