- GRN Making, RGP, NRGP and other all Documentation Work.
- Stock taking of Raw materials & Components.
- Raw material, Components and all incoming materials planning with review of functions in Customer Demand.
- Receipt and Issuance Materials.
- Minimum Stock level and Critical level Maintain.
- Rejection Material Sent to Supplier End.
- First In First Out (FIFO) Maintain.
- Making Daily E_WAY BILL Generate taking the cenvat Credit through System.
- To maintain 5S & safety (100 %) in the shop floor area.
- Manpower Utilization/Manpower Handling.
- Inventory works.
- PerpetualPhysical Inventory.
- Material loTracebility batch coding system.
- BOM Bill of material.
- Method of doing FIFO.
- Minimum/Maximum re-order invcntory levels.
- Type of Materials-Plastic RM, BOPs and consumables and spares part and PR items, WIP.
- Management of charging material in as require from production.
- Maintain the material as per MINMAX level.
- Prepare the GRN after unloading.
- Maintain stock levels and avoid shortages or overstocking.
- Track incoming and outgoing goods.
Preferred candidate profile
- Candidate should be from plastics injection moulding or autocomponent industry.