04 Aug
|
Larsen u0026 Toubro
|
Delhi
04 Aug
Larsen u0026 Toubro
Delhi
candidate should have explicit knowledge of Traverse survey / Tunnel profiler / Auto CAD / NATM Tunnel survey and they have ask to handle an independent Section at Project location. Centre line marking for current proposed line. Candidate should have TBM Tunnel & NATM Experience in Survey Field Compulsory candidate should have worked in Tunnel Projects with NATM experience in the Survey Field.
Centre line marking for new proposed line. Cross section survey Road Alignment Work & Leveling Operation.
Volume
Calculation.
Curve
Setting.
Road Alignment
Work & Leveling Operation. PCC & RCC Work In Drain, Pipe line, Sewage Line, & Underground treatment plant Supervising/assisting junior team member Liaising with the client and other key stakeholders Ensuring all OH&S; procedures are being adhered to getting out for works, survey guidance systems Survey monitoring and scanning Reading and interpreting drawings Operations pertaining to marking, levelling, quality, inspections and surveys and checks Data accumulation, construction layout surveys, precision measurements of length, angle, elevation, area, and volume, as well as horizontal and vertical control surveys, and the analysis and utilization of data
📌 Manager/Engineer (Survey) - UG Metro (Delhi)
🏢 Larsen u0026 Toubro
📍 Delhi