- Supervise the staff, equipment including problem solving. 10%
KRA2 2. Weighbridge inspection
- Check for the weighbridge condition, to assure that there is no defect. 5 %
KRA3 3. SAP
- Data entry the container information including the weight, container no., truck no., driver name on the SAP
- Fill in the data of the container on the loading slip sheet. 70 %
KRA4 4. Cargo/container inspection
- Responsible for identifying the cargo /container actual weight to be matching the loading slip sheet and SAP and to revert back to the responsible area in case of mismatching 15 %