HPS/2024/375
Bunching Supervisor
Male
1
2 to 5
DME
Bunching/Stranding Machine Supervisor
A. Knowledge of bunching/stranding machine operations
B. Minimum 5 years experience from cable industry
C. Qualification - ITI/Diploma and above
D. Vacancy - 1
Strictly abide by various operating procedures to ensure secure production.
According to the lay length requirements specified by the process, install the corresponding pulleys and lay length gears according to the lay length table.
Install the pay-off reel, and pull the copper wire through the wire storage of the pay-off rack to the wire inlet end of the host, and then pass into the host through the guide input. One of them must be guided by the meter counter (otherwise, the meter counter will not count after power on).
Install the take-up reel, and the wire passing through the host will pass through each guide and twist the bow, and finally wind a few turns on the take-up reel.
Turn on the main power switch in the electric cabinet of the host,
and set the length budget of the meter counter according to the process requirements. If the original length of the original meter is not zero, it should be cleared.
Flip the six toggle switches on the side of the electrical control cabinet of the host to the ON position.
Check whether the tray at the bottom of the main unit has been lowered to the end. If it has not been lowered to the end, loosen (turn it counterclockwise) the switch of the oil pressure pump to lower it to the end, and close the door and cover.
Turn the "speed setting potentiometer" on the electrical cabinet of the host computer to the end counterclockwise, press the "motor start" button, and then slowly turn the "speed setting" potentiometer clockwise, and the machine will start running at the running speed Indicated by the tachometer.
When the predetermined length is reached, the machine will automatically stop. After the twisti