07 Aug
|
Catalydd Engineering and Consulting Services
|
Chennai
07 Aug
Catalydd Engineering and Consulting Services
Chennai
1. To perform 100% visual inspection for the
Final inspection and gauging inspection.
2. Sorting the OK & Not OK parts.
3. Moving out the non-conforming parts with identification.
4. Updating the rejection details to the reporting person.
5. Periodic updatation of inspection logs.
6. Checking parts with gauges, Vernier Calliper Micrometer and attribute
gauges.
📌 Quality Control Engineer (Chennai)
🏢 Catalydd Engineering and Consulting Services
📍 Chennai