07 Aug
|
Manikaran Power
|
Delhi
07 Aug
Manikaran Power
Delhi
Position Title
Installation & Commissioning Head – Battery Energy Storage System (BESS)
Location- South Delhi MET City
Key Responsibilities
Project Execution & Installation
Lead installation activities for utility-scale or C&I; BESS projects.
Supervise EPC contractors, subcontractors, and site engineers.
Ensure installation of:
Battery containers/racks
PCS/Inverters
Transformers & switchgear
EMS/SCADA systems
HVAC & fire suppression systems
Monitor project schedules, milestones, and resource allocation.
Coordinate with civil, electrical, and SCADA teams for smooth execution.
Commissioning & Testing
Lead pre-commissioning and commissioning activities.
Execute FAT, SAT, and performance testing.
Coordinate energization and synchronization activities.
Validate:
BMS (Battery Management System)
EMS (Energy Management System)
PCS functionality
SCADA communication
Protection & relay schemes
Conduct troubleshooting and root-cause analysis during startup.
Safety & Compliance
Ensure strict adherence to:
Electrical safety standards
LOTO procedures
HV/LV safety protocols
IEC / IEEE / NFPA standards
Implement EHS procedures across project sites.
Conduct toolbox talks and safety audits.
Ensure compliance with statutory and grid code requirements.
Stakeholder & Vendor Coordination
Coordinate with:
OEMs
Utilities/Grid operators
Consultants
Clients
Regulatory authorities
Manage commissioning documentation and approvals.
Support client inspections and acceptance testing.
Team Management
Lead commissioning engineers, installation supervisors, and technicians.
Develop manpower deployment plans.
Train teams on BESS systems and commissioning procedures.
Drive performance, productivity, and quality standards.
Documentation & Reporting
Prepare and review:
Method statements
Commissioning procedures
Test reports
Punch lists
As-built documentation
O&M; handover packages
📌 Senior Installation & Commissioning Engineer Bess Delhi
🏢 Manikaran Power
📍 Delhi