1. To Operate the RO plant as per design Parameters
2. Individual handle the plant form DCS/PLC
3. Chemicals Injection process for RO ( CIP ).
4. Regeneration of RO-DM plant,
5. To Check the Parameters pH Conductivity.
6. Follow the instruction of the Shift in charge .
7. Unloading of the HCL at HCL unloading tank with all safety precaution.
8. Identify the abnormal condition in the Plant ( Like leakage , Abnormal sound of the Pumps )
9. Basic knowledge of the Water Tenement Process.
10. All Work to be done with safety standards as per SOP, and high light the deviation .
11. Keeping the house keeping the surrounding area.