1. PRINCIPAL ACCOUNTABILITIES
AccountabilitiesMajor Activities
Survey Data Review & Assessment
* Review and critically assess route, topographical and profile survey data
(DGPS/Total Station/drone-LiDAR) submitted by survey agencies and EPC
contractors for accuracy, completeness and adherence to scope.
* Cross-verify ground/terrain data, cross-sections, crossings (river, road,
rail, power line, telecom) and soil investigation inputs against field
conditions and standard survey practices.
* Assess deliverables against TSA/scope requirements and applicable survey
codes/practices before acceptance for design use.
* Flag incomplete, inconsistent or substandard survey submissions back to the
survey agency/EPC for correction and resurvey where needed.
Profiling, Tower Spotting & Optimization
* Review and validate line profile drawings (Section/Plan & Profile) prepared
by the survey agency/EPC, ensuring correctness of levels, spans and ground
clearance.
* Assess and optimize tower spotting on the approved profile – evaluating span,
angle of deviation,
ground clearance and soil conditions – to ensure towers
are placed at the technically correct and most optimal locations.
* Optimize tower locations to minimize ROW impact, forest land use, number of
angle/section towers and overall project cost, in coordination with ROW and
Engineering.
* Review and approve re-spotting proposals where towers are shifted due to ROW,
forest, technical or geotechnical constraints.
Error Identification & Resolution
* Identify errors, discrepancies or anomalies in survey data, profile drawings
and tower schedules submitted by survey agencies/EPC and get them corrected
before design freeze.
* Investigate field-reported discrepancies during construction (e.g., tower
centre shift, ground level mismatch, span/clearance issues) and determine
root cause and corrective action.
* Maintain a log of errors/observations identified, corrective actions taken
and closure status for each survey agency/EPC c
📌 Senior Surveyor (India)
🏢 Apraava
📍 India