Ensuring high availability and reliability and of all rotary assets at JMD CPP complex to achieve business objectives by:
Continual Improvement of the Asset Management Strategies and optimizing the Maintenance Programs (PM, PdM, RCM and Minor/Major Overhauls) including effective application of various machinery condition monitoring tools and techniques.
Optimally utilize the Reliability Improvement Programs (Proactive-FMEA, Reactive-RCFA).
Ensuring required level of inbuilt reliability in the procurement of recent assets as well as at the time of refurbished / repaired assets.
Monitoring the KPIs for Critical Rotary Assets as well as the Maintenance Programs.
SECTION III: KEY RESPONSIBILITIES AND ACCOUNTABILITIES OF THE ROLE
Responsibilities
Maximize availability and reliability of GTs and STGs of CPPs in JMD complex.
Responsible for timely overhaul of GTs and STGs as per schedule. Prepare check sheets for Frame 9 and Frame 6 GTs CI, HGPI and MI jobs.
Responsible for keeping adequate spares for scheduled overhaul & for emergency requirement.
Responsible to identify areas for improvement, modification & optimizing resources of rotary equipment for all CPP plants in JMD complex.
Responsible for performance of Rotary team reporting to him.
Review of plant changes and modifications related to Rotary equipment.
Reviewing and recommending of training required for rotary engineers.
Coordination with other departments of on rotary related engineering issues.
Administer & lead his group in the proper direction.
Implement & maintain IMS in his area of control.
Vendor Coordination.
Development of standards and codes, SMPs and best practices for RIL.
Preservation system implementation in CPP complex.
RCM Studies for critical equipment in CPP comp