Main responsibility includes creating Electrical primary design deliverables. Projects range in size, complexity, and voltage class from small distribution equipment upgrades to large transmission projects. This position can influence the future of the resiliency, reliability, and economic operation of the electric grid.
Role And Responsibilities
Position may include leading or executing the following assignments:
- Preparation of proposals and scope development, including conceptual designs and execution plans.
- Prepare engineering cost and man-hour estimates and schedules.
- Prepare detailed engineering drawings for EHV projects for AIS & GIS substations from 33kV to 765kV.
- Prepare design to support detail engineering such as General Arrangements Plan, Elevations, Above and Below grade Conduit layouts & connection detail, Grounding layouts & connection detail, Lighting & Lightening protection with respective details, Bill of Materials and Design Calculations.
- Prepare Calculations with renowned software such as CDEGS,
ETAP, Wings, Mathcad, Visual Lighting & others.
- Prepare AIS Busbar design and reports.
- Coordinate design activities with other departments (Civil/Structural, Networks, Transmission Line, etc.). Reviewing designs and attending virtual meetings and coordinating with Clients.
- Coordinating with team members and monitoring project schedules, submitting with quality.
- Produce detailed electrical substation design packages compliant with the required client technical standards or IEC/IEEE/NESC. Coordinate design activities with other Burns & McDonnell Global Practices and Office Locations.
- Provide guidance and mentoring to less experienced team members.
- Develop and improve processes, tools, and/or implement current technologies into the design process.
- Perform quality reviews for other engineers and designers.
- Demonstrate creativity, foresight, and judgment in anticipating and solvi