• Preparing BOQ of all drawing /Autocad• Checking bills of contractors • Taking Technical decision of site • Site supervision/execution, checking and assuring that the construction work is as per the project technical specifications and drawing • Making indent for required materials • Keeping records of site requirements • Holding meetings with Architect & Contractor.
- Manpower Planning & Structuring • Applying plans as per daily schedules.
- Planning for daily basis work.
- Daily progress report of project civil work.
- Quality analysis.
- Preparation of bar bending schedule for structural element • Find the quantity of steel, concrete, brick, cement, sand, aggregate etc.
- Layout of all type of structure • Co-coordinating with Contractor and Mechanical Team Project Works In Organization:
- Silos 2nos (15000 MT each)
• Admin Building • Raw Material Godown • Conveyor Trench • Pre-Cleaning, Unloading pit, elevator pit • Weigh Bridges• Boiler and Rendering • all technical foundation (cooling tower, water pump, heat pump, ahu, chiller), Floor trimix with puff slab, PVC drain, tile etc.
- Piling Foundations • Road Work (GSB, DLC, PQC) • Flooring Work • Compound Wall • DG Foundation • Electric Control Room • Electric Cable Trench • Electric Motor Foundation • Service Bridges • OilTanks 2nos • Tile Works • Transformer Foundation Mechanical,civil,electrical work.
Preferred candidate profile
Min 6 yrs experience in current plant setup as a project engineer civil (Food/FMCG/ Chemical/Pharma Industry)