Main Purpose of Job_ (Why job exists/what it must achieve)_
_Level:_
L-5
Manage Production activities of lines with adherence to daily production plan ensuring material and manpower planning and getting line output with respect to quantity and quality
_Reports to:_
Asst. Manager (In charge)
_Organization Unit / Location_
SMIL-Chakan 3
Main Responsibilities / Job Summary
- (Primary deliverables of role and its scope)_
KPIs_ (Measurable parameters of the role_) &
Dimensions_ (What is the span of the role)_
1. Adherence to daily Production plan
2. Effective Manpower utilisation to achieve daily production target
3. Ensure material availability on line
4. Highlighting concerns related to Material / manpower/machine
5. To achieve Quality and Quantity of Production of line
4. To minimize rework / rejection on line
5. Guide / operate machines online when required
6. To do Minor machine breakdown / sets as per plan
7. To maintain and sustain line 5S/TPM activities
8. Ensure proper PPE usages by line operators
9.
Ensure operators are adhering to SOPs wrt start up, first piece flow inspection etc
10. To do Kaizens to improve productivity
11. To educate / train / guide operators wrt safety/quality requirements of line
12. To support in implementation of TPM & MSES “A” activities
13. Any other task entrusted by your seniors
14. Robotic Teaching -Yashkawa Robot
15. Weld Shop Production Experince
- Daily Productivity (Plan Vs Actual)
- OEE (Desired Vs Achieved)
- FTT (First Time Right)
- Safety-Zero Incidents / Accidents
- MSES System (JH, TPM, TQM)