31 Aug
|
EVIO Private
|
Mumbai
31 Aug
EVIO Private
Mumbai
We are looking for Electrical Engineer for Data Center Projects.
Electrical Engineer - 4 OpeningProject Manager - 1 OpeningAssistant Project Manager - 2 OpeningSr. Electrical Engineer - 2 Opening
Location: Hyderabad
We are seeking a skilled and motivate d PM/ APM/Sr / Electrical Engineer - Data Center - Construction
project with a strong background in construction and site execution. The ideal candidate will have hands-on experience in Electrical Installation Works across Commercial, Residential, and IT Building projects. The role requires site-based project execution, coordination with clients, contractors, and internal teams to ensure timely and quality project delivery.
Key Responsibilities:• Supervise and execute electrical installation works such as:• Cable laying (Power & Control)Cable tray installation LT / HT Panel installation and termination• Conduit and wiring work (Light, Power,
and DB circuits)• Lighting fixture installation and testing• Review and interpret electrical drawings, BOQs, and specifications.• Plan daily and weekly site activities, manpower, and materials.• Coordinate with subcontractors for timely work execution.• Conduct quality inspections, testing, and commissioning of electrical systems• Ensure adherence to safety and quality standards at site.• Prepare and maintain daily progress reports, material records, and work checklists.• Support Project Manager in billing documentation and material reconciliation.
Candidate Requirements:• Knowledge of electrical installation standards.• Familiarity with cable sizing, load distribution and panel connections.• Hands-on experience with AutoCAD drawings, MS Office, and site reporting.• Should be able to read and understand electrical drawings.• Data center setting experience is preferred
📌 PM/ APM/Sr / Electrical Engineer - Data Center - Construction (Mumbai)
🏢 EVIO Private
📍 Mumbai