Responsible for
Storm water drain layout.
Drain excavation.
PCC bedding.
Drain wall construction.
Cover slab installation.
Catch pits.
Road gully chambers.
Outfall connection.
Slope verification.
Water flow testing.
WATER SUPPLY SYSTEM
Responsible for
Fresh water pipeline laying.
HDPE/DI/UPVC pipeline supervision.
Valve chamber construction.
Borewell connection.
Pump room coordination.
Underground water tank connection.
Pressure testing.
Leakage testing.
Flushing of pipelines.
Water meter chamber installation.
SEWERAGE SYSTEM
Sewer line excavation.
Bedding preparation.
Pipe laying.
Joint inspection.
Manhole construction.
Inspection chambers.
Drop manholes.
Slope verification.