02 Sep
|
Blue Star India
|
Tada
02 Sep
Blue Star India
Tada
1. Leading CFT by guiding Team for implementing productivity initiatives. Capacity improvement, BCT reduction, ECRS Kaizen, Visual Control Tools implement, NVA time reduction, TIMWOOD, Offline manpower reduction, SWCT analysis, Line Balancing, OEE & Line Efficiency analysis, Relief manpower, Adaptable Manpower Line, Takt time production, SMED implementation.
- 2. Conduct periodic Time study, Motion analysis, Method Study in Plant.
- 3. Improve ergonomics for fatigue free environment.
- 4. To improve manufacturing layouts and building ergonomics for new product lines.
- 5. Flexible Assembly line designing, One piece Flow, Conveyor transfer Line
- 6. Elimination of flow Convergent/ Divergent, Multiple handling & WIP elimination, Area efficiency & Plant space optimization per unit
- 7. Maintains knowledge of best practices in manufacturing methods, trends and developments in technology and equipment.
- 8. Identifies and assesses various problems to established manufacturing standards and best practices. Lot size kaizen, Mixed load feeding,
System implementation (like; Fixed time & Fixed lot), Manual transport elimination, Travelling Distance reduction etc.
- 9. Plan IE activities with KPI's and maintain MIS. Daily Labour Efficiency report publishing.
- 10. Should have experience improvement activities Incoming inspection/ Receiving & Store/ Dispatch with understanding of VSM, Flow kaizen, Lead time reduction, Inventory reduction, Small lot kaizen. Knowledge in Heijunka/ Pull system/ Kanban level up Plant.
- 11. Exposure of Material handling improvement activities to improve o/p, delivery. (MHE exposer e.g.: Tow Truck, AGV, Reach Trucks, Type of Conveyors, Lifting & shifting, ASRS etc.)
- 12. Experience of delivering Training & Workshop for Plant Team for basics of IE Standards for maintaining awareness & culture.
- 13. Understand and analyze graphs and statistics and other complex information;
- 14. Prepare and control Manpower plan (direct & indirect) in co-ordination
📌 Industrial Engineering (Tada)
🏢 Blue Star India
📍 Tada