- EXTERNAL GASINGLE LINE DRIAGRAMSYSTEM CONFIGURATIONEARTHING SCHEMEEPLAN DRAWINGSPANEL INTERNAL &
- EXTERNAL GASYSTEM CONFIGURATIONPOWER CKT. DIAGRAMCONTROL CKT. DIAGRAMPLC IO CKT DIAGRAMCABLE SCHEDULELABEL LISTTERMINAL LAYOUT /DRAWING, TERMINAL LOOP DRAWINGSBOM GENERATION THRO EPLAN &
- IN EXCELDESIGN SPECSDATA BASE GENERATIONEPLAN DRAWING STANDARDISATION AS BUILT &
- AS COMMISSIONED DRAWINGSREPORTING TO DESIGN ENGINEER - IN HIS ABSENCE TO PROJECT MANAGERPROJECT EXECUTION &
- MONITORINGCoordinate with Client for Detail Project Design Inputs, Clarification if any Receive Design Inputs & clarification from Client Submit Drawings to the Client for approval Raise Indent &
- Float Enquiries to the Vendors Receive offers from the vendors & do the Technical evaluation Forward to Purchase department for commercial negotiations and Placing orders Co-ordinate with Purchase Team / Vendors for timely supply of material Do Follow-up with Panel Builders & if required do visits for timely delivery of Panel Visit to Panel builder on completion of Panel manufacturing for QC verification and prepare Internal Inspection Report Raise inspection call to Client & do FATTake dispatch clearance from Client/Consultants Prepare Packing List & take acknowledgement from the vendor & submit to Purchase Team and Instruct to prepare Invoice and make arrangement for dispatch.