Staff TPP Op (India)

Staff TPP Op (India)

06 Sep
|
UltraTech Cement
|
India

06 Sep

UltraTech Cement

India

Job Purpose

To ensure secure & smooth field operation while start up- shutdown of AFBC and CFBC boiler, turbine and its auxiliaries by Co-ordination with shop floor working agencies. Identify the field abnormalities and report to CCR and Shift Incharge. Ensuring field Process optimization while carrying all TPP field activities, following all safety standards of ABG group.

Job Context & Major Challenges

Job Context : Thermal power plant consists of 1x35 MW and 1x22.5 MW total capacity 57.5MW, condensing type steam turbine with three uncontrolled extractions. Having two boiler Unit-1 CFBC type, multi fuel boiler having steam generation capacity of 170 TPH and Unit-2 AFBC type having steam capacity 110 TPH with working pressure -85 Kg/CM2. The auxiliaries system for steam turbine comprises of HP/LP heaters, high pressure boiler feed pumps having working pressure 95 Kg/CM2, and Air cooled condensers consisting of total 14 Nos. of forced draft fans for 2 units having dia. Of fan-9.5 Mtrs, Steam jet air ejectors, gland steam condensers, 02 Nos of Deaerator system etc.



The design fuel for boiler is lignite. The approximate fuel consumption would be 900T/Day considering full load running of all two turbines. The fuel handling plant comprises of two stage screenig -Primary and secondary including hydraulic truck unloaded with various belt conveyors and associated equipments. The lime stone & ash handling system is of pneumatic type. The water treatment system consists of R O & D M plant. Wast water will be treated in waste water treatment plant. Auxiliary cooling water system with induced draft cooling towers and raw and fire water system. There are 08 nos. of screw air compressors with driers for pneumatic as well as instrument air requirement. The field operation of entire TPP field would be a challenge for all engineers with parallel field operation of two units without greed (island mode). Also various fuels may be used in proportions which needs proper skills and cont

📌 Staff TPP Op (India)
🏢 UltraTech Cement
📍 India

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: staff tpp op (india) / india

Subscribe to this job alert:

Get the latest job offers by email for: staff tpp op (india) / india