08 Sep
|
India Nippon Electricals Limited- INEL
|
Hosur
08 Sep
India Nippon Electricals Limited- INEL
Hosur
- Floating RFQ to suppliers.
*Prepare supplier selection list based on internal Team guidance
*Conduct Design for Manufacturing (DFM) and Design for Assembly (DFA) reviews.
*Identify manufacturing feasibility, critical dimensions and potential risks.
*Prepare the Part Development Plan and development timeline.
*Coordinate prototype and sample development.
*Ensure development milestones are completed as per customer schedule.
*Monitor tool manufacturing progress against the development schedule.
*Conduct Trial Run / Run at Rate activities.
*Drive NPD activities according to PPAP and APQP requirements.
*Ensure PPAP approval before mass production.
*Develop parts within the approved target cost.
*Develop optimum strip layout / blank size for sheet-metal components where applicable.
*Track development cost against budget.
📌 Senior Engineer - NPD (Hosur)
🏢 India Nippon Electricals Limited- INEL
📍 Hosur