09 Sep
|
Randstad
|
Bengaluru
09 Sep
Randstad
Bengaluru
Closely Monitor Preventive and Corrective Maintenance of all signalingsystem (IXL, RBC, Point Machine, Signal, Axle Counter, OnBoard) Through USIT tool use Balise programming of fixed Balise. Prepare punch point excel sheet of stage-03 Indoor and Outdoor SignalingEquipment and close all punch point with GC and NCRTC. Stage-03 Book of Circuit verification also done and some correction doneby GC. Perform Energetic test of trains on mainline to verify all A
📌 signalling maintainer (Bengaluru)
🏢 Randstad
📍 Bengaluru