Responsibilities:
1. Check overall dimensions as per gad.
Make 2d drawings for manufacturing.
Bill of material preparation.
Bom checking w.r.t part drawing and assemblies for completeness of valve.
File releasing (5 sets) for manufacturing.
Deliverable:
1) In time submission of manufacturing drawing as per master plan.