10 Sep
|
EVIO Private
|
Hyderabad
10 Sep
EVIO Private
Hyderabad
We are looking for Electrical Engineer for Data Center Projects.
Electrical Engineer - 4 Opening
Project Manager - 1 Opening
Assistant Project Manager - 2 Opening
Sr. Electrical Engineer - 2 Opening
Location: Hyderabad
We are seeking a skilled and motivated PM/ APM/Sr / Electrical Engineer - Data Center - Construction project with a solid background in construction and site execution. The ideal candidate will have hands-on experience in Electrical Installation Works across Commercial, Residential, and IT Building projects. The role requires site-based project execution, coordination with clients, contractors, and internal teams to ensure timely and quality project delivery.
Key Responsibilities:
• Supervise and execute electrical installation works such as:
• Cable laying (Power & Control)Cable tray installation LT / HT Panel installation and termination
• Conduit and wiring work (Light, Power, and DB circuits)
• Lighting fixture installation and testing
• Review and interpret electrical drawings,
BOQs, and specifications.
• Plan daily and weekly site activities, manpower, and materials.
• Coordinate with subcontractors for timely work execution.
• Conduct quality inspections, testing, and commissioning of electrical systems
• Ensure adherence to safety and quality standards at site.
• Prepare and maintain daily progress reports, material records, and work checklists.
• Support Project Manager in billing documentation and material reconciliation.
Candidate Requirements:
• Knowledge of electrical installation standards.
• Familiarity with cable sizing, load distribution and panel connections.
• Hands-on experience with AutoCAD drawings, MS Office, and site reporting.
• Should be able to read and understand electrical drawings.
• Data center setting experience is preferred
📌 Pm/ Apm/sr / Electrical Engineer Data Center Construction Hyderabad
🏢 EVIO Private
📍 Hyderabad