11 Sep
|
Larsen and Toubro
|
Mumbai
11 Sep
Larsen and Toubro
Mumbai
LNT/MF-S/1706062
- HCI-Heavy Civil Infrastructure
- Mumbai
- Posted On 08 Apr 2026
- End Date 05 Oct 2026
- Required Experience5 - 5 years
Skills
Knowledge & Posting Location
Formwork Reactor (Formwork) Turbine Building & Tunnels (Formwork)
Minimum Qualification
Trade Certificate (ITI)
Job Description
- Preparation of Formwork programme based on the overall construction methods
- Finalization and coordination of Shuttering Scheme
- Ensuring effective and proper utilization of shuttering and staging materials
- Planning and allocation of materials / labour / Plant & machinery for formwork activities in coordination with concerned persons at site
- Making mock-up of various System formwork
- Periodical reconciliation of formwork materials
- Preparing stock statement of formwork materials both in Units and in Nos., with area of shuttering done category-wise, Plywood / Timber procured during the quarter / till date and Productivity report.
- Maintain close interaction with stores and site people for proper accounting of materials
- Despatch and receipt notes to be sent to Cluster Office
- Making of purchase requisition for Plywood and Timber after thoroughly analyzing the number of repetitions
- Receipts of plywood / formwork materials to be acknowledged after quality checks to Cluster Office on monthly basis
- 100% materials reconciliation at the end of the job
📌 Manager Formwork - Saidongar (Mumbai)
🏢 Larsen and Toubro
📍 Mumbai