14 Sep
|
Troikaa Group
|
Ahmedabad
14 Sep
Troikaa Group
Ahmedabad
Sr.No.
RESPONSIBILITIES
1.0
PRODUCTION ACTIVITY
1.1
Transfer of secondary packing materials from Ware house to Packing Hall.
1.2
Operation and Cleaning of Energetic Pass Box
1.3
Handling, Storage and Calibration of Standard Weights
1.4
Cleaning of Machine Parts
1.5
Cleaning and operation of cartanator machine.
1.6
Operation and Cleaning of Carton Over Printing, Inspection and Rejection System.
1.7
Operation and Cleaning of Double Side Hologram Sticker Labeling Machine
1.8
Operation and Cleaning of Conveyor Belt
1.9
Operation and cleaning of De-cartooning Machine.
1.10
Operation and Cleaning of Rotary Sticker Labeling Machine
1.11
Operation and cleaning of Automatic high Speed orientation shrink packing machine
1.12
De labeling of Bottles
1.13
To perform related in-process checks during packing activities.
1.14
Handling of Rejections generated during secondary packing.
1.15
Handling and timely removal of scrap from the area.
1.16
Adherence to the all cGMPs, SOP and quality requirements.
2.0
CROSS FUNCTIONAL ACTIVITY
2.1
Assist Engineering persons during preventive maintenance and break down maintenance.
2.2
Assist QA person during Qualification and Validation process.
3.0
To report the Officer / Executive and Designee whenever any discrepancy observed in the area.
4.0
Beside the above activities to perform all other activities assigned by reporting senior.
📌 Technical Supervisor Ahmedabad
🏢 Troikaa Group
📍 Ahmedabad