- He should prepare / study the Electrical SLD for panels and be able to select the correct size of enclosure/s both for WP and Exd panels.
- He should be able to do the costing of panels.
Primary Responsibility
- He should be conversant with IS 13947 and IS 8623 standards and specifications.
- Thorough knowledge of MCCBs, ACBs, MCBs, ELCBs and all LT electrical switchgear.
- Prepare the wiring diagram and work instructions for assembly, prepare the Bill of Materials for the panel, co-ordinate with the Purchase department for component specifications.
- Knowledge of AUTO CAD is a must, preferably EL CAD.