Description
1. PRINCIPAL ACCOUNTABILITIES:
Accountabilities Major Activities
Quality Management 1. Quality Planning & Documentation
• Implement Field Quality Plan (FQP) and Inspection & Test Plans (ITPs) for WTG, Substation and Transmission line works.
• Follow OEM Guidelines, PQHC Requirements.
• Storage & Maintenance of WTG Components.
• Review & Approve Crane related Machinery.
• Certified Climbing on WTG TT Tower.
• Prepare, Review and approve contractors’ method statements and work procedures.
• Prepare & Implement PQP, SOP, Check lists & Formats in line with OEM requirements, TS, Codes & Standards and FQP.
• Maintain comprehensive QA/QC records — inspection reports, RFI’s, Check Lists, RA Bills, FOM & NCR’s, calibration certificates, test results, and approvals.
2. Incoming Material Inspection
• Verification of material and equipment quality against approved drawings and specifications.
• Check manufacturer’s test certificates and shipping documents.
• Site inspection for:
o Blade, Nacelle, Hub, Tubular Tower and Other WTG BOQ.
o USS, Transformers,
Reactors, AIS equipment, breakers, CTs, PTs, isolators, LA, SVG’s, HT/LT SGR Panels .
o Conductors, insulators, hardware fittings.
o Steel structures, tower members, bolts/nuts, earthing materials.
3. WTG Foundation, Installation Quality Oversight
• Civil works: Geo tech reports review, Survey, Marking, Excavation, PCC, RCC foundations, USS foundations, cable ducts, Back Filling, Roads, 33kv as per specs.
• Aggregates, Cement, Cubes Casting , Traceability, Curing & Testing.
• PQHC Implementation as per OEM Guidelines
4. TT Tower Installation
• Verify foundation interface before tower erection.
• Check tower section identification and erection sequence.
• Inspect flange mating surfaces and cleanliness.
• Verify correct bolt grade, size and quantity.
• Ensure correct bolt tightening sequence.
• Verify torque/tensioning using calibrated tools as per OEM procedure.
• Check bolt marking afte
📌 Field Quality Manager (India)
🏢 Apraava
📍 India