24 Sep
|
Jones Lang LaSalle (JLL)
|
Gurugram
24 Sep
Jones Lang LaSalle (JLL)
Gurugram
Job Summary
Role Purpose: To take complete ownership of entire Electrical Utilities Distribution for 18 Commercial Towers in Cyber City. Ensure 100% uptime of power with safety, compliance and cost optimization.
Key Responsibilities
- HT/LT Power Distribution: Overall responsibility of 33KV/11KV HT system, Transformers, HT/LT Panels, Bus Ducts, ACB/VCB
- Daily load monitoring, Power factor management, Capacitor panels for PF > 0.99
- Coordination with DHBVN for HT supply, Load sanction, ABT meter
- DG ATS Operations: 25+ DG Sets - 750KVA to 2000KVA across 18 buildings
- Auto/Manual Synchronization of DGs for common area load during DHBVN shutdown
- ATS, AMF panel health, load sharing, paralleling logic in PLC
- Fuel management, Load test, and DG running cost optimization
- BMS, PLC Automation: SCADA/BMS monitoring for DG, Transformer, Pumps, Capacitor
- PLC logic checking for ATS, Synchronizing panel, Load shedding sequence
- Implement IoT based predictive maintenance
- Compliance Safety: Ensure compliance to NBC 2016, IE Rules, CEA, Electrical License
- HT/LT PM schedule, Thermography, Insulation testing, Earth pit testing
- Safety audits, Lock Out Tag Out, Arc flash PPE
- Team Cost Management: Lead team of Shift Engineers, Electricians, DG Operators
- AMC management of OEMs - Siemens, ABB, Cummins, Kirloskar
- Energy cost reduction - Peak load cutting, Power factor improvement, Diesel saving
Key Result Areas (KRA)
- Power Uptime | 99.99% uptime for Common Area Critical Load. Zero power failure due to Electrical
- DG Synchronization | Successful auto sync during DHBVN shutdown
- Preventive Maintenance | 100% PM completion of DG, Transformer, HT/LT, Capacitor as per schedule. PM adherence > 98%
- Safety Compliance | Zero Electrical accident. Zero NC in Fire/ Electrical Audit. Thermography 2 times/year
- Energy Cost Saving | Maintain PF > 0.99 to avoid penalty. Diesel consumption reduction 5% YoY. Peak demand management
- Breakdown Response | TAT
- Team Capability | Monthly training for 80+ staff. 100% skill matrix completion. Zero manpower attrition >15%
- Documentation | Digital logbooks, Load trend report daily, Energy report weekly for Management
Qualifications / Requirements
- B.E Electrical, Electrical Supervisor License, 12+ Years exp in Commercial/ IT Park. Must have handled >15 DG Synchronization project.
Skills
- Siemens/ABB HT Panel
- PLC Ladder Logic
- BMS
- Load Management
- DG Synchronization
- SCADA
- IoT based predictive maintenance
- Team Handling (50+)
Location
In office - Gurugram, HR
Scheduled Weekly Hours
48
Disclaimer: This job posting has been aggregated from external source. Role details, content, and availability are subject to change. Applicants are advised to confirm the latest information directly on the company website before applying.
📌 TECHNICAL MANAGER - ELECTRICAL (Gurugram)
🏢 Jones Lang LaSalle (JLL)
📍 Gurugram