- Need to address the L2 level issue in ODA, CCA and LAA.
- Handling Issues in the existing GSPM parameter.
- Interest booking or application issue.
- New scheme code parameterization.
- PSP,OS upgradation, Infosys patch testing.
- Ultra Saver issue fixing.
- EOD batch job failure rectification on daily basis as and when required.
- Handling recent customization patch testing.
- Need to resolve L2 call related to the OD, CC & TL.