QA/QC Manager / Engineer – Data Center Construction (Bengaluru)

QA/QC Manager / Engineer – Data Center Construction (Bengaluru)

24 Sep
|
Mepa2z
|
Bengaluru

24 Sep

Mepa2z

Bengaluru

Title: QA/QC Engineer / QA/QC Manager

Project: Data Center Project

Location: Noida, Uttar Pradesh

Qualification: B.E./B.Tech in Civil Engineering

Experience

- 8-12 years of QA/QC experience in data center project and construction projects.
- Proven experience in Data Center, Industrial, Warehouse, Commercial Building, or Large Infrastructure Projects.

Preferred Candidate Profile:
- Candidates from Tamil Nadu will be preferred.
- Must have relevant Data Center project experience.
- Should be currently working in or around Noida/NCR and available for site-based project execution.
- Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.
- Solid experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.

Role Overview:

We are seeking an experienced QA/QC Engineer / QA/QC Manager to lead and manage all quality assurance and quality control activities for a large-scale Data Center Project in Noida involving PEB structures, structural steel works, composite steel-concrete structures, RCC/concrete works, foundations, and associated civil works.

The candidate will be responsible for establishing, implementing, and maintaining the project QA/QC system to ensure compliance with approved drawings, specifications, method statements, Inspection & Test Plans (ITPs), applicable standards, and client/consultant requirements.

Key Responsibilities

- Quality Assurance:

- Prepare and implement Project Quality Plans (PQP), Inspection & Test Plans (ITPs), quality procedures, checklists, and method statements.
- Review AFC drawings, specifications, BOQ, material specifications, and project quality requirements.
- Establish inspection procedures for PEB, structural steel, composite structures, RCC, and civil works.
- Coordinate with client, consultant, contractors, subcontractors, design teams, and third-party inspection agencies.
- Ensure all materials and construction activities comply with approved specifications and applicable standards.
- Maintain complete QA/QC documentation, inspection records, test reports, MIRs, WIRs, NCRs, and quality dossiers.

2. PEB & Structural Steel Quality Control:
- Inspect incoming PEB and structural steel materials including plates, sections, bolts, welding consumables, and accessories.
- Verify Mill Test Certificates (MTCs), material grades, heat numbers, and traceability records.
- Monitor fabrication quality including:
- Cutting and profiling
- Plate preparation
- Welding
- Dimensional control
- Camber and alignment




- Surface preparation
- Painting and coating
- Review and monitor WPS, PQR, and welder qualification records.
- Coordinate and review NDT activities such as UT, MPI, and DPT.
- Inspect high-strength bolted connections, torqueing, and installation records.
- Monitor erection activities including alignment, plumbness, levels, bracing, stability, and connection details.
- Verify member identification and traceability from fabrication through erection.
- Inspect roofing, cladding, flashings, gutters, and associated PEB accessories.

3. Composite Structure Quality Control:
- Inspect composite beams, deck sheets, shear connectors/studs, and associated structural steel components.
- Verify deck profile, thickness, fixing arrangements, and end laps.
- Inspect shear stud welding quality, spacing, positioning, and testing.
- Verify reinforcement placement over metal decking.
- Check temporary supports and shoring before concrete placement.
- Monitor concrete pouring, slab thickness, levels, curing, and finishing.
- Verify openings, embedded items, sleeves, and MEP coordination prior to concrete placement.

4. RCC / Concrete Quality Control:
- Inspect reinforcement for:
- Grade and diameter
- Bar bending schedules
- Spacing and positioning
- Lap lengths
- Development lengths
- Anchorage
- Concrete cover
- Chairs and spacers
- Inspect formwork for dimensions, stability, line, level, plumbness, and cleanliness.
- Conduct pre-pour inspections and obtain necessary approvals.
- Monitor concrete batching, transportation, placing, vibration, finishing, and curing.
- Verify concrete grade, slump, temperature, and cube sampling requirements.
- Coordinate laboratory testing and compressive strength evaluations.
- Inspect foundations, pedestals, columns, beams, slabs, and other RCC elements.
- Verify construction joints, expansion joints, water stops, and embedded items.
- Monitor repairs of honeycombing, cracks, and other defects as per approved procedures.

5. Material Inspection & Testing:
- Prepare and submit Material Inspection Requests (MIRs).
- Verify all materials against approved material submittals.




- Maintain material traceability from receipt through installation.
- Control and segregate non-conforming materials.
- Coordinate third-party laboratory testing and inspections.

6. Inspection & Documentation Control:

Maintain and control records for:

- MIR – Material Inspection Requests
- WIR – Work Inspection Requests
- RFI – Requests for Inspection / Information
- Inspection & Test Plans (ITPs)
- Method Statements
- Concrete Pour Cards
- Slump Test Reports
- Cube Test Reports
- Rebar Inspection Reports
- Welding Inspection Reports
- NDT Reports
- Bolt Torque Reports
- Coating / DFT Reports
- Survey & Alignment Reports
- PEB Erection Inspection Records
- NCR/CAR Records
- Final Quality Dossiers

7. NCR Management & Corrective Actions:
- Identify quality deviations and issue NCRs.
- Conduct root-cause analysis for recurring issues.
- Develop and monitor Corrective and Preventive Action (CAPA) plans.
- Ensure timely NCR closure with supporting documentation.
- Maintain quality observation registers and punch-point records.
- Conduct periodic audits of subcontractors and vendors.

8. Site Coordination & Reporting:
- Attend daily and weekly quality meetings with client, consultants, and stakeholders.
- Coordinate with construction, engineering, planning, procurement, and subcontractor teams.
- Ensure inspections are completed prior to commencement of subsequent activities.
- Monitor subcontractor QA/QC performance.
- Conduct quality awareness programs and toolbox talks.
- Ensure latest approved drawings and revisions are available at site.
- Support preparation of as-built drawings and final handover documentation.
- Prepare weekly and monthly QA/QC reports.

Required Qualifications & Experience:
- B.E./B.Tech in Civil Engineering.
- 8-12 years of QA/QC experience in construction projects.
- Mandatory experience in Data Center Projects.
- Strong expertise in PEB/Structural Steel and RCC/Concrete Works.
- Experience in welding inspection, NDT coordination, material traceability, and quality documentation.
- Exposure to industrial, warehouse, commercial, or large infrastructure projects is preferred.
- Experience handling client and consultant inspections.
- Exposure to third-party inspections and testing agencies.
- Candidates currently working in Noida/NCR will be preferred.
- Candidates from Tamil Nadu are encouraged to apply.

Preferred Certifications:
- ISO 9001
- CSWIP / AWS
- Welding Inspector Certification
- NDT Level II

📌 QA/QC Manager / Engineer – Data Center Construction (Bengaluru)
🏢 Mepa2z
📍 Bengaluru

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: qa/qc manager / engineer – data center construction (bengaluru) / bengaluru

Subscribe to this job alert:

Get the latest job offers by email for: qa/qc manager / engineer – data center construction (bengaluru) / bengaluru