Project Head – IPA (Isopropyl Alcohol) Plant (Panagarh)

Project Head – IPA (Isopropyl Alcohol) Plant (Panagarh)

24 Sep
|
OMNI INTERNATIONAL CONSULTANTS Co
|
Panagarh

24 Sep

OMNI INTERNATIONAL CONSULTANTS Co

Panagarh

Project Head – IPA (Isopropyl Alcohol) Plant

Greenfield Petrochemical Project | Panagarh, West Bengal A large, well-funded chemical group is building India's largest chemical cluster at Panagarh, Durgapur (West Bengal) — starting with a 50,000 TPA greenfield IPA plant, alongside a Hydrogen Generation unit and OSBL/Utilities. This is a long-term, multi-project pipeline, not a single-plant assignment.

We're looking for a Project Head to take single-point accountability for the IPA project from detailed engineering through mechanical completion, commissioning, and PGTR (Performance Guarantee Test Run).

What you'll own

- End-to-end project execution — engineering review, HAZOP/SIL, procurement of long-lead equipment, construction, commissioning, and handover to operations
- Coordination with the technology licensor, EPC contractor, Owner's PMC, and in-house teams
- Cold and hot commissioning and Performance Guarantee Test Runs (PGTR) through to steady-state handover
- CAPEX budget, cost control, and Board-level reporting
- Building and mentoring the owner's project team

What you bring

- 15–25 years in chemical/petrochemical plant projects, with 8–10 years in a project leadership role (Projects Manager / Commissioning Manager level — operations-only backgrounds won't fit this one)
- Project experience in Hydrogen Plants and Hydrotreaters (Naphtha, Diesel, VGO, or Slurry Hydrotreater),



and/or IPA project experience — candidates without direct IPA exposure but with a strong refinery/petrochemical project background are also welcome
- Direct IPA exposure is a robust plus, from any of these backgrounds:

◦ Commissioning or operations leadership on continuous alcohol/solvent plants, including high-purity, electronic-grade or pharma-grade IPA finishing (distillation, azeotropic column balancing, purification/drying trains) ◦ Technology-licensor experience leading cold/hot commissioning and PGTRs across greenfield plants using hydrogenation-based or catalytic hydration IPA processes

◦ EPC-side commissioning leadership on greenfield IPA or solvent-recovery plants, including azeotropic distillation and drying/purification trains

- Genuine end-to-end delivery experience: concept to commissioning, with operational exposure
- Prior rotational/expat greenfield project assignments are a plus — comfortable working through a full project lifecycle to completion
- Comfortable relocating to Durgapur, West Bengal for a minimum of 18–24 months (long-term roles available across the wider cluster)

Client identity shared confidentially once mutual interest is established. INTERESTED?

- Please send your full profile to [email protected]; [email protected]; [email protected]
- Or visit www.omni-interconsult.com and make an application directly online.

Work Location: In person

📌 Project Head – IPA (Isopropyl Alcohol) Plant (Panagarh)
🏢 OMNI INTERNATIONAL CONSULTANTS Co
📍 Panagarh

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: project head – ipa (isopropyl alcohol) plant (panagarh) / panagarh