Responsibilities
Mechanical BOP Project Execution
- Execute and monitor installation and commissioning activities of Mechanical BOP systems in thermal power projects.
- Coordinate project execution activities related to CW system, ACW system, Fire Fighting System, DM Water System, Service Water System, Air Compressors, Fuel Oil System, and other auxiliary systems.
- Ensure compliance with project schedules and construction milestones.
- Track erection progress and identify bottlenecks affecting project completion.
Station Piping Execution
- Supervise fabrication, erection, hydro testing, flushing, and commissioning of station piping systems.
- Monitor piping installation activities as per approved drawings, specifications, and quality standards.
- Ensure proper execution of steam, condensate, cooling water, service water, fire water, compressed air, and auxiliary piping networks.
- Review piping layouts, isometrics, support drawings, and material specifications.
Engineering &
- Technical Coordination
- Review engineering drawings, technical specifications, and project documents.
- Coordinate with design consultants, EPC contractors, and OEMs for technical clarifications.
- Resolve site engineering issues and ensure timely implementation of design changes.
- Participate in constructability reviews and engineering discussions.
Contractor &
- Vendor Management
- Supervise contractors and monitor productivity, quality, and safety compliance.
- Coordinate manpower, machinery, and resources required for project execution.
- Verify work completion and support certification of contractor bills.
- Ensure timely availability of materials and equipment at site.
Commissioning &
- Project Handover
- Coordinate pre-commissioning and commissioning activities of Mechanical BOP systems.
- Support system readiness checks, hydro tests, flushing activities, trial runs, and performance testing.
- Ensure timely closure of punch points and commissioning observations.
- Facilitate smooth system handover to Operations and Maintenance teams.
Project Planning &
- Monitoring
- Monitor project schedules, resource allocation, and execution progress.
- Prepare daily, weekly, and monthly progress reports.
- Identify project risks and implement mitigation measures.
- Coordinate with Civil, Electrical, C&I;, Procurement, and Planning teams to achieve project objectives.
Quality, Safety &
- Compliance
- Ensure adherence to quality standards, project specifications, and inspection requirements.
- Enforce compliance with HSE guidelines, permit-to-work systems, and statutory regulations.
- Participate in safety audits, quality inspections, and project reviews.
- Promote a zero-incident safety culture across project execution activities.
Qualifications
- Minimum 7 years of experience in execution of Mechanical BOP and Station Piping projects for Thermal Power Plants.
- Hands-on experience in erection, testing, commissioning, and project management of utility piping systems and auxiliary plant equipment.
- Exposure to supercritical and ultra-supercritical power projects will be preferred.
- Experience in coordinating with EPC contractors, OEMs, consultants, and construction agencies.
- Experience in greenfield thermal power project execution will be an added advantage.
📌 Deputy Manager - Mechanical (BOP/ Station Piping) (Singrauli)