28 Sep
|
Acumen Training And Hr Solutions
|
Dahej
28 Sep
Acumen Training And Hr Solutions
Dahej
Key Result Areas: Project Development & Approval
Major Activities :
- Develop specific Capex projects through various stages of FEL levels.
- Conceptualize and develop scope, cost, timeline of Capex proposals in coordination with
- functional teams & engineering consultants.
- Prepare Activity list & scheduling for Project, all in coordination with project controlling group.
- Prepare Scope of work and cost estimation according to STYRENIX CapEx guidelines and
- approval requirements (documentation delivery on time)
Outcome: Project proposal development according to STYRENIX guidelines
Key Result Areas: Engineering –Concept/ Basic/ Detailed
Major Activities :
- Lead Basic Engineering activities like; PFDs, P&IDs;, Mass Balance, Energy Balance, etc. ,
- with help of OPS team and Consultant.
- Coordination with OPS team members for all cross-functional data like Process data,
- Electrical/ Mechanical Load list, civil layouts, etc.
- Participate in HAZOP /SIL study and incorporate the recommendations into project.
- Ensure all the ‘agreed to’ recommendations are implemented in relevant documents
- Participate in Detailed Engineering activities like; equipment list & specifications, equipment &
- piping layouts, Load list, civil layouts, Instrument list etc.
- Participate in DCS (Control system) related engineering activities pertaining to the process
- design & controls.
- Ensure design basis aligns with STYRENIX Asset Care program
Outcome: Preparation of Required Engineering package as per Project objective and specification.
Key Result Areas: Technical Procurement support of Project material
Major Activities :
- Preparation of Process Data Sheets and BOQ for Material & Services
- Carry out Technical bid Comparison for Equipment/ services in conjunction with
- procurement lead from process point of view
- Ensure technical clarification for timely execution of Orders
- Post ordering activities; like – design/drawing approval in line with the agreed schedule.
- Coordinating & participating in stage wise inspection.
- Support procurement to expedite timely payment to ensure timely delivery
Outcome: Project material procured as per defined specification with approved technical vendor, following
STYRENIX Procurement procedures and Delegation of Authority guidelines
Key Result Areas: Construction & Installation activities of projects
Major Activities :
- Project scheduling in coordination with Project controlling group for relevant areas
- Leading the in office installation activities, with regular monitoring to ensure timely execution
- of project, as planned
- Coordination with Function Head/OPS team for shutdown planning to meet timelycompletion, as required, depending on Project
- Ensure all the safety standard are followed during engineering, construction and
- commissioning
- Ensure desired quality in work, through close coordination with Contractors & Consultants.
- Ensure regular safety training at site for employees, contractors and visitors, including “Behavior Based Safety programs
- Ensure use of KMS for incident reporting (including Near miss & first aid) and MOC
Outcome: Construction activity completed according to planned timeline, defined quality aspect, and within budget.
Key Result Areas: Coordination for Control System requirement from Process Engineering perspective
Major Activities :
- Participate in development of Control Philosophy in Coordination with OPS team and
- engineering consultant
- Participate in FAT (Factory Acceptance test) & SAT (Site acceptance Test), in coordination
- with Operation, SHE & engineering consultant team
- Ensure implementation of system design and control philosophy by simulation thru
- appropriate participation
- Help facilitate training activities on new systems/screens with Operations & supplier
- Outcome:
- Design, Installation & commissioning of Control System as per design specifications.
Key Result Areas: Pre-Commissioning Activities & Start up
Major Activities:
- Participate in preparation of detailed schedule of pre-commissioning and startup along with OPS team and SCM
- Participate for PSSR(Pre Startup Safety Review) with OPS/SCM, SHE and GTO team (if required)
- Ensuring implementation/compliance of all PSSR recommendation
- Lead in pre-Startup activities of control system, loop checking, calibrations etc. thru waterrun, pilot run till establishment of designed process
- Support final commissioning led by OPS team
- Lead the on-site coordination with suppliers, consultants & OPS for imparting training for relevant Equipment/ systems.
-
Outcome: Safe & Successful startup and handing over of Project as per defined scope
📌 Process Chemical Engineer (Projects) (Dahej)
🏢 Acumen Training And Hr Solutions
📍 Dahej