• Preparation and execution Turbine assembly shop plan – monthly.
• To monitor work progress by PDCA method and finalize the job handover dates to packing shop
• To arrange skill-based manpower and necessary machine, positioners to achieve targeted LE & OE and TQM parameters and plan to achieve the parameters mainly hydro test, mandrel, clearance setting, Module measurements.
• To ensure no waiting time by availability of shop resources: tooling, fixtures, measurement instruments, machines
• To check the shop record sheets and check sheets filled by workmen and supervisor
• To ensure effective implementation of IMS management systems
• Doing project delay analysis: plan vs actual, finding reasons for delays using PDCA method.
• Doing brainstorming with Manufacturing and QC section for process improvement and control.
• Providing suggestions to design dept for design related improvements to reduce cycle time.
• Doing assembly of Turbine & generator parts as per Overhauling site team requirement
• Doing assembly scope of work in refurbishment work as per the scope of Purchase Order.
• To achieve the EHS objective by controlling unsafe acts and unsafe conditions and periodic reviews of HIRA.
• Controlling usage/shop disposal of hazardous waste like oil-soaked cotton, plastic, chemical cans, paint drums
• Achieving the target of Safety by enhancing 5S score and SPI- Safety Performance Index at shop floor & office.
📌 Turbine Assembly Manager for LMTG 2.0 (Badayla Chorasi)
🏢 Larsen and Toubro
📍 Badayla Chorasi
Reply to this offer
Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.