Factory Head (Wada)

Factory Head (Wada)

04 Oct
|
Real Stock Analyzer
|
Wada

04 Oct

Real Stock Analyzer

Wada

Role

Head of Factory — Modular Furniture Division

Scope

Both Furniture manufacturing plants — Daman and Wada

Departments

Sheet metal, wood, assembly & carpentry, and polish/finishing — design through build, at both plants

Location

Base at Daman; regular travel to Wada

What the role owns

Spans every department that touches a piece of furniture from design to build — sheet metal, wood, assembly & carpentry, and polish — at Daman and Wada.

Production planning & management

— Single-point accountability for production across both plants — output, quality, on-time delivery, and shop-floor discipline at each site.

— Daily and weekly production planning against booked orders, with visible tracking of what's on the floor, what's blocked, and why.

— A functioning capacity plan the tendering and sales teams can sell against, instead of finding out about constraints after a booking is made.

— Deliver Daman to a monthly billing run rate of ₹7 Cr and Wada to ₹2 Cr, with production capacity as the enabler, not the constraint.

Workforce management

— Direct line management of plant supervisors and production leads across sheet metal, wood, assembly, and polish, closing any open leadership or supervisory gaps on the floor.

— Shift, manpower, and contractor planning at each site, sized to the booked order load rather than fixed headcount.

Quality control & lean tools

— Quality sign-off on client mock-ups, samples, and first-off production runs before they leave the plant.

— Introduce and run basic lean shop-floor tools — 5S, visual management, standard work — as the operating discipline for all four departments, not a one-time audit.

— Root-cause resolution of recurring quality issues, rather than one-off firefighting.

Cost management

— Material consumption and wastage control against the division's targets, tracked plant by plant.

— Vendor-facing production decisions in coordination with procurement, including timely resolution of rate and supply issues that affect the floor.

Safety

— Ownership of shop-floor safety standards and incident prevention across sheet metal, wood, and finishing operations — areas with genuine machine and material handling risk.

Problem solving

— Machine and capex follow-through, so equipment and infrastructure decisions are closed out on schedule rather than left open.

— First point of escalation for floor-level blockers that would otherwise sit unresolved for want of an owner.

Design team & software

— Build and lead a proper design team for the division — currently a gap, not a function — staffed and structured to serve both plants rather than working project by project.

— Standardise the team on contemporary design software — Pytha, CAD, and other current-generation tools — as the working default, not something individual designers pick up on their own.

— Tie the design team's output directly into production: drawings and cutting lists that feed the shop floor without manual re-work, so design software output becomes production input, not a separate exercise.

Process improvement through modern manufacturing tools

— Bring CAD-driven design-to-production handoff and modern cutting/processing methods into standard practice, reducing rework between design and the floor.

— Own shop-floor execution of the division's manufacturing digitization roadmap — design-to-production automation, computer-vision quality checks,



smart inventory, and CNC additions — turning it from a plan on paper into running practice.

— Evaluate and introduce current-generation production software — nesting and cutting optimisation, production scheduling — alongside the design team's tools, so design and the shop floor run on one connected system rather than two.

— A regular production report to leadership covering output, delays, and decisions needed — a single source of truth across both plants.

Product & market development

— Own the manufacturing case for new furniture segments the division chooses to pursue — hospitality, healthcare, education/institutional, kitchens, and wardrobes among them.

— For each segment worth pursuing, design and stand up the manufacturing line from scratch — layout, workflow, department sequencing, and staffing — not just adapt an existing line and hope it fits.

— Build and own the capex and equipment plan for every new line: what machinery, what it costs, what it takes to commission, and in what order — presented as a business case leadership can actually decide on, not a wish list.

— Build the capacity plan behind each new line — realistic monthly output, ramp-up timeline, and the point at which it needs its own dedicated capacity versus sharing existing plants.

Immediate objectives and how they'll be managed

First 30 days

— Primary objective: get the Wada plant fully operational and billing from 1 November — this is the single most time-critical deliverable of the role, and everything else in month one is sequenced around it.

— Walk both plants and every department, meet every supervisor, and build a working map of what stands between Wada and a 1 November billing start — staffing, equipment, and any open decisions.

— Issue the first production report and agree its format and cadence with leadership, with Wada's readiness against the 1 November date as its first line item.

First 60 days

— Wada billing at or moving visibly toward its ₹2 Cr/month target; Daman tracking toward ₹7 Cr/month.

— Close out any remaining leadership and staffing gaps identified in month one, at both plants.

— Agree a capacity plan with the sales and tendering teams so commitments are made against real plant capacity.

— Have a prioritised, dated list of open machine and capex decisions, with an owner and a close-out date on each.

— First working outline of the design team — structure, headcount, and the software (Pytha, CAD, others) it will standardise on.

First 90 days

— Run a standing weekly production report across both plants, with Wada and Daman billing tracked against their ₹2 Cr and ₹7 Cr monthly targets.

— Have lean operating discipline — 5S, visual management — live in at least one department per plant, as a working model for the rest.

— Design team staffed and running on its standard software toolset, producing drawings and cutting lists that feed production directly.





— Give leadership a preliminary view on which new-segment opportunities are worth a full manufacturing business case.

Ongoing management rhythm

— Weekly production report to A.N. Rao covering output, delays, and decisions needed.

— Monthly review of billing against the ₹7 Cr (Daman) and ₹2 Cr (Wada) targets, alongside material consumption, cost, and safety metrics.

— Quarterly review of the capacity plan and any new-line business cases in progress.

What success looks like

First 90 days

— Wada operational and billing from 1 November, as committed.

— A design team in place, working on standardised software, and feeding production directly.

First two quarters

— Daman billing consistently at ₹7 Cr/month and Wada at ₹2 Cr/month, with production no longer the limiting factor.

— Material consumption tracking consistently to the division's target, not as a one-off month.

— A functioning capacity plan the tendering and sales teams actively sell against.

— A go/no-go recommendation — with capex, equipment, and capacity numbers attached — on each new-segment opportunity under consideration.

First year

— At least one new product line moved from pilot to a running manufacturing line with its own capacity number, or a documented decision not to pursue it and why.

— At least two items from the digitization roadmap — design-to-production automation, computer-vision QC, smart inventory, or CNC additions — live on the shop floor, not still in planning.

— A shop floor running on standard work and visual management as normal practice, not a one-time initiative.

Ideal background

— Diploma or Bachelor's degree in Mechanical or Industrial Engineering, with working knowledge of CAD and design — needed to bridge the design and production teams, not just run the floor.

— Extensive production leadership experience with genuine lean implementation — 5S, standard work, visual management — not lean as a certificate on a resume.

— Furniture or wood-based panel manufacturing experience is preferred, not mandatory — strong general manufacturing process discipline (machinery, materials, multi-department shop floors) matters more than the specific industry.

— A track record of running more than one production site and making trade-off calls across them, not just managing a single shop floor.

— Direct experience setting up a new production line from scratch — layout, machinery selection, capex justification, and ramp to target output — not only running lines someone else built.

— Working familiarity with modern manufacturing and design software — Pytha or equivalent furniture design tools, CAD/CAM, nesting, production scheduling/MES — and openness to piloting AI-driven tools such as computer-vision quality checks — this role is expected to modernise the floor, not just run it as inherited.

— Experience building or significantly upgrading a design function, not just consuming its output — this role is expected to set the team up, not inherit one.

— Comfortable being the decision-maker on personnel and vendor issues that have been left unresolved — this is not a caretaker role.

— Strong communication and interpersonal skills — this role sits between the shop floor, division leadership, procurement, sales, and design, and has to hold all of them accountable.

Pay: ₹2,000,000.00 - ₹2,200,000.00 per year

Benefits:

- Health insurance
- Life insurance
- Provident Fund

Work Location: In person

📌 Factory Head (Wada)
🏢 Real Stock Analyzer
📍 Wada

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: factory head (wada) / wada