05 Oct
|
Western Electrical Unit No 2
|
Bhopal
05 Oct
Western Electrical Unit No 2
Bhopal
Role & responsibilities
Key Responsibilities
1. Production Planning & Execution
* Prepare daily, weekly and monthly production plans based on committed delivery schedules.
* Plan and coordinate activities across winding, core, assembly, tanking, ovening, oil filtration, testing and dispatch.
* Monitor production against targets and identify bottlenecks affecting delivery.
* Ensure availability and proper allocation of manpower, machines, materials and other resources.
* Coordinate with Purchase, Stores, Design and Quality teams to prevent production delays.
* Improve productivity and reduce manufacturing cycle time and rework.
2. Quality & Process Control
* Lead and guide the Quality team for incoming, in-process and final inspection.
* Ensure adherence to approved drawings, GTPs, manufacturing procedures and applicable IS/IEC/customer specifications.
* Establish appropriate stage-wise quality checks and hold points.
* Ensure proper documentation and traceability of critical manufacturing activities.
* Drive reduction in rejection, rework and recurring quality issues.
3. Root Cause Analysis & Troubleshooting
A major requirement of this position is the ability to technically investigate manufacturing and testing failures.
The Plant Head should be able to:
* Investigate in-process failures and abnormalities.
* Perform structured Root Cause Analysis (RCA).
* Identify whether the problem originates from design, material, workmanship, process or testing.
* Define and implement Corrective and Preventive Actions (CAPA).
* Guide the team in troubleshooting issues such as:
* Low IR/Megger values
* Ratio/tap-position abnormalities
* High resistance or unbalance
* Excessive losses
* Impedance deviations
* HV/LV withstand failures
* Induced/DVDF test failures
* Oil leakage
* Temperature-rise related issues
* Other routine and type-test abnormalities
* Maintain records of major failures and ensure learning is incorporated into future manufacturing.
4. Testing & Customer Inspections
* Ensure transformers are completely ready before customer/third-party inspection.
* Review internal test results before offering transformers for inspection.
* Coordinate and handle inspections by customers, utilities and third-party agencies.
* Technically represent the company during inspections and resolve observations raised by inspectors.
* Ensure testing is carried out according to applicable IS/IEC standards and approved specifications.
* Ensure inspection observations and NCRs are closed within defined timelines.
5. Team Leadership
* Lead Production, Quality and Testing teams and establish explicit accountability.
* Conduct regular production and quality review meetings.
* Guide engineers and supervisors in solving day-to-day technical and operational problems.
* Develop technical capability of junior engineers through practical training and mentoring.
* Maintain discipline, safety and coordination across departments.
* Evaluate manpower requirements and support recruitment and development of the plant team.
6. After-Sales & Site Support
* Technically guide the after-sales/service team for transformer-related complaints.
* Analyse customer complaints and determine probable root causes before deputing teams to site.
* Guide site teams regarding required checks, instruments and corrective actions.
* Review site failure reports and determine whether issues relate to manufacturing, installation, protection, loading or site conditions.
* Ensure customer complaints are closed quickly while protecting the companys technical and commercial interests.
* Feed learnings from site failures back into Production, Design and Quality.
7. Dispatch & Delivery Responsibility
* Ensure transformers are technically and commercially ready for dispatch as per committed schedules.
* Review pending jobs and proactively escalate risks to delivery.
* Coordinate inspection clearance, testing documentation, accessories, packing and dispatch readiness.
* Ensure transformers are dispatched without pending technical or quality issues.
8. Continuous Improvement
* Identify bottlenecks and opportunities for improvement across manufacturing processes.
* Implement systems for reducing rejection, rework, testing failures and production delays.
* Develop SOPs, checklists and process controls for critical activities.
* Track recurring problems and ensure permanent corrective action rather than temporary solutions.
* Promote 5S, workplace safety and preventive maintenance practices.
Key Performance Indicators (KPIs)
Performance of the Plant Head will primarily be measured on:
* On-time production and dispatch
* Production plan vs. actual achievement
* First-pass testing success rate
* In-process rejection and rework
* Customer inspection clearance / first-time acceptance
* Reduction in recurring quality failures
* Customer/site complaint closure time
* Manufacturing cycle time
* Productivity and manpower utilisation
* Compliance with quality and safety systems
📌 Plant Head Transformer Manufacturing (Bhopal)
🏢 Western Electrical Unit No 2
📍 Bhopal