11 Oct
|
Hindalco Industries
|
Lohardaga
11 Oct
Hindalco Industries
Lohardaga
Business
MetalsUnit
MiningLocation
Maliparbat MinesPoornata Position Number of the job Reports to Poornata Position No: Poornata Position Title of the job:
AH SurveyorReports to Poornata Position Title:AH Mining BagruFunction: Reports to Function: Department:
Reports to Department: Date of Last Updation/Approval
1) Job Purpose
- To take responsibility for measuring excavation area and submit surface plan, geological plan, water danger plan to DGMS on a quarterly basis with respect to the Bagru mines
- To estimates over burden, top soil, laterite over bauxite area and arrange for their removal through contractor and ensure payment
2) Dimensions:Business/SBU/Unit Revenue Business Workforce Number Unit Workforce Number Function Workforce Number Department Workforce Number Other Quantitative and Significant Parameters for the Job: Budgets/Volumes/No. of Products/Geography/Markets/ Customers or any other parameter
3) Job Context & Major Challenges:Job Context:
Hindalco Industries Limited operates 4 bauxite mines across the Lohardaga cluster in Chhattisgarh. Bagru plateau in the Lohardaga cluster, with composite deposit of bauxite, has 2 operating mines (4 leases) about 20 km from Lohardaga. The Bagru mines cater to alumina refineries at Muri and Renukoot.
Besides transporting bauxite through tippers by road, bauxite is shipped through train from the railway siding at Lohardaga which gets bauxite through an aerial ropeway from the Bagru mines. Once mining plan is finalised in collaboration with the Geological department and approved by the Indian Bureau of Mines (IBM), mining operation is undertaken at the mines primarily through contractual manpower. Laterite is removed, bauxite is drilled, excavated through excavators and dumped through dumpers and unloaded in crusher hover or in bauxite stock room.
At the end of the mining lifecycle, the waste is removed and used in back filling of closed mine pits and making them ready for plantation through horticulture contract.
This is a statutory position. The role is responsible for measuring excavation area and submitting surface plan, geological plan,
water danger plan to DGMS on a quarterly basis showing progress of excavation. It is critical to ensure measurement of length, breadth, width of excavated area and conduct proper risk analysis to ensure complete accuracy.
Another important element of the role is to estimate over burden, top soil, laterite over bauxite area and arrange for their removal through contractor. Close coordination with the contractor to check whether all resources in terms of manpower and equipment are being deployed and work is progressing as per plan. Criticality is to keep track of progress of work on the ground to ensure completion of tasks within deadline to make the mine ready for bauxite excavation and ensure payment as per actual work done.
In view of the large contingents of contractual workers deployed for this process, contract labour management is a critical element of the role.
This role is required to undertake creation of green belt particularly for rehabilitation of mines. Water management through rain water harvesting is also an important element of the role. It involves dealing with the local community sometimes.
Job Challenges
- Harmonious community management
4) Key Result Areas/Accountabilities:Key Result Areas/AccountabilitiesSupporting Actions1) Business Excellence
- Measuring excavation area, over burden, top soil, laterite accurately with respect to the Bagru mines
- Overseeing removal of over burden, top soil, laterite as per mining plan.
- Overseeing implementations of SOPs in all aspects of operation under jurisdiction
2) Cost
- Implementing budgets and achieving cost saving without compromising delivery by driving continuous process improvement across area of operation
- Certifying work accurately to optimise cos
3) Cash
- Improving profitability by optimum deployment of contractors
4) Customer
- Collaborating with operations team and contractors to make mines free of top soil, over burden and laterite and ready for excavation of bauxite as per mining plan
- Minimizing response time in providing information and solutions to all internal and external customers
5) Sustainability
- Implementing all statutory compliance within timelines by submitting the following to the Director General of Mine Safety (DGMS) on a quarterly basis:
- surface plan
- geological plan
- water danger plan
- Implementing compliance of Integrated Management system and Energy Management System
- Overseeing good Housekeeping practices in area under jurisdiction
- Partnering in green initiatives
6) Safety
- Implementing Safety standards to achieve zero harm through implementation of safety standards such as LOTOTO, HIRA, 5S
- Monitoring implementation of safety related training
7) People development and engagement
- Monitoring intake and deployment of physically fit and appropriately trained contractual workforce and ensuring their continuous training and wellbeing as per company guidelines.
- Monitoring implementation of contract management.
5) Role Specific Competencies Technical competencies
- B Tech in Mining Engineering
- 1st Manager certificate from DGMS
Behavioural competencies
- ABG Leadership Competencies
6) Job Purpose of Direct Reports:Position TitleJob PurposePosition No.Nil
7) Relationships:Relationship TypeFrequencyNatureInternalHRDailyContract Labour ManagementF&A; HeadMonthlyBill paymentsSafety HeadDailyImplementation of Safety guidelinesExternalDirector General of Mine Safety (DGMS)QuarterlyCompliance Local communityWeeklyFor ease of operations
8) Organizational Relationships:Position that it reports intoPosition and its peers
(NoP=4)Position/s that report into
(NoP=0)
- AH Mining Bagru
LMS Surveyor
LMS Foreman (3)
¢ ¢ Nil Declaration: This is a true reflection of the position Job HolderReports to ManagerName
Date of Entry/Approval
1 | Page
Report
📌 Surveyor (Lohardaga)
🏢 Hindalco Industries
📍 Lohardaga