12 Oct
|
Sidvin Core-Tech
|
Bengaluru
12 Oct
Sidvin Core-Tech
Bengaluru
- Load calculation, assessment of building characteristics, selection and equipment sizing for HVAC system.
- Preparation of Specifications, Technical Datasheets, Requisitions for Quotation, Technical queries, Technical Bid Analysis, Purchase Requisitions and Vendor Drawings / Documents review.
- Preparation of HVAC system - Ducting Layout Plan, Section & Typical details,
- Ducting line list, Ducting penetration and Connection details.
- HVAC MTO, D&ID;, Airflow diagram, E3D extracted HVAC arrangement drawing, typical installation details, shop drawings and as-built drawings.
- Preparation of HVAC DRAIN - ISOMETRIC DRAWING, PIPING LAYOUT Drawing.
- Detail design using E3D modelling shall carry out following typical activities.
a) Verify/Update HVAC equipment against Approved Vendor data.
b) Verify/Update duct routing, accessories as per Air flow diagram.
c) Perform clash check and resolve interfaces.
d) Space reservation of equipment.
e)
Chiller/refrigerant piping routing.
f) Duct/pipe supports.
- Co-ordination with other disciplines for interface engineering
Requirements
1. Bachelor’s degree in engineering or related technical field.
- At least 10 - 12 years of experience in Design for Oil & Gas project.
- Software knowledge E3D, Navis works, AutoCAD, MS office, etc.
- Should have knowledge of HVAC related Codes & standards.
5.
Experience in basic engineering and detail design of HVAC equipment, duct routing, accessories, etc.
- Positive communication skills in English (written and oral)
- Ability to work under pressure and meet project deadlines.
- Self-motivated with the ability to use own initiative.
- Ability to work independently with clarity on scope and responsibility
📌 HVAC Engineer (Bengaluru)
🏢 Sidvin Core-Tech
📍 Bengaluru