- Mark out and level ceiling boxes from the box and lighting drawings; check depth, diagonals and skirting line before fixing.
- Fix aluminium harpoon profiles on walls, MS/aluminium frames and gypsum boxes with correct anchors and screw spacing.
- Fit LED strips, drivers and wiring exactly as per the lights drawing – no soldering or joining of strips.
- Stretch and lock backlit, plain, mirror/lacquered and printed membranes without creases, dust marks or scratches; use heat gun and spatulas correctly.
- Cut and finish openings for lights, AC grilles, sprinklers and speakers with proper rings and backing.
- Protect finished membranes, metallic and mirror sheets during and after installation.
On site – aluminium louvers, HPL and mesh
- Install aluminium louver systems (wall, pergola, ceiling) on MS/aluminium framing to the architect's spacing and alignment.
- Fix Trespa HPL facade panels and SS316 mesh with the specified brackets, fasteners and tension systems.
- Drill, cut, rivet and fasten aluminium sections accurately; make small brackets and adjustments on site.
Carpentry and general
- Make and fix wooden/gypsum frames, boxes and backing for ceilings and panels.
- Read box drawings, key plans and lighting layouts; measure and report site dimensions to the office.
- Coordinate with the client's electrician and false-ceiling contractor.
- Unload, store and handle materials; keep tools, drivers and offcuts accounted for.
- Follow site safety rules – helmet, harness at height, scaffold/ladder discipline.
- Report daily progress, snags and material shortages on WhatsApp with photos.