Staff having skill or expertise in following activities are suitable for this role.
- Ability to understand AutoCAD 2D drawings and 3D Catia models.
- Outfitting activities such as installation of pipes/spools based on the line diagram in AutoCAD (for layout) and 3D models in Catia (for orientation of spools).
- Hydro pressure testing, leak testing and flushing of spools after installation of spools based on the pressure mentioned in customer approved documents.
- Structural installation works which include different types of welding processes and hydro pressure testing of heavy structures after complete installation.
- Installation of equipment / critical equipment having minute tolerance limits, based on the location mentioned in drawing and to meet required parameters mentioned in customer approved documents.