23 Oct
|
Eastman Auto u0026 Power
|
Gurugram
23 Oct
Eastman Auto u0026 Power
Gurugram
Objective 1: Achieve Daily Production Targets Safely & Consistently
Key Results
KR1: Achieve ≥ 98% daily production plan adherence.
KR2: Ensure zero production loss due to avoidable planning or execution gaps.
KR3: Maintain 100% shift handover accuracy and production reporting.
KR4: Resolve ≥ 95% shift issues within the same shift.
Objective 2: Improve Productivity & Line Efficiency
Key Results
KR1: Improve line efficiency / OEE to ≥ 85% for critical lines.
KR2: Reduce cycle time by 8–12% through line balancing and work optimization.
KR3: Eliminate top 3 bottlenecks identified each quarter.
KR4: Implement minimum 2 productivity improvement actions per quarter.
Objective 3: Ensure Product Quality & First-Time-Right Manufacturing
Key Results
KR1: Achieve First Pass Yield (FPY) ≥ 98%.
KR2: Reduce in-process defects and rework by 20–25%.
KR3: Ensure 100% adherence to SOPs, control plans, and quality checkpoints.
KR4: Close ≥ 95% quality issues within agreed timelines.
Objective 4: Reduce Downtime & Improve Equipment Reliability
Key Results
KR1: Ensure 100% preventive maintenance compliance as per schedule.
KR2: Reduce unplanned machine downtime by 15–20%.
KR3: Support maintenance in RCA for all major breakdowns.
KR4: Achieve MTTR improvement of 10% for recurring issues.
Objective 1:
Achieve Daily Production Targets Safely & Consistently
Key Results
KR1: Achieve ≥ 98% daily production plan adherence.
KR2: Ensure zero production loss due to avoidable planning or execution gaps.
KR3: Maintain 100% shift handover accuracy and production reporting.
KR4: Resolve ≥ 95% shift issues within the same shift.
Objective 2: Improve Productivity & Line Efficiency
Key Results
KR1: Improve line efficiency / OEE to ≥ 85% for critical lines.
KR2: Reduce cycle time by 8–12% through line balancing and work optimization.
KR3: Eliminate top 3 bottlenecks identified each quarter.
KR4: Implement minimum 2 productivity improvement actions per quarter.
Objective 3: Ensure Product Quality & First-Time-Right Manufacturing
Key Results
KR1: Achieve First Pass Yield (FPY) ≥ 98%.
KR2: Reduce in-process defects and rework by 20–25%.
KR3: Ensure 100% adherence to SOPs, control plans, and quality checkpoints.
KR4: Close ≥ 95% quality issues within agreed timelines.
Objective 4: Reduce Downtime & Improve Equipment Reliability
Key Results
KR1: Ensure 100% preventive maintenance compliance as per schedule.
KR2: Reduce unplanned machine downtime by 15–20%.
KR3: Support maintenance in RCA for all major breakdowns.
KR4: Achieve MTTR improvement of 10% for recurring issues.
📌 Production Engineer/Sr.Engineer (Gurugram)
🏢 Eastman Auto u0026 Power
📍 Gurugram