Objective 1: Achieve Daily Production Targets Safely & Consistently

Key Results

KR1: Achieve ≥ 98% daily production plan adherence.

KR2: Ensure zero production loss due to avoidable planning or execution gaps.

KR3: Maintain 100% shift handover accuracy and production reporting.

KR4: Resolve ≥ 95% shift issues within the same shift.

Objective 2: Improve Productivity & Line Efficiency

Key Results

KR1: Improve line efficiency / OEE to ≥ 85% for critical lines.

KR2: Reduce cycle time by 8–12% through line balancing and work optimization.

KR3: Eliminate top 3 bottlenecks identified each quarter.

KR4: Implement minimum 2 productivity improvement actions per quarter.

Objective 3: Ensure Product Quality & First-Time-Right Manufacturing

Key Results

KR1: Achieve First Pass Yield (FPY) ≥ 98%.

KR2: Reduce in-process defects and rework by 20–25%.

KR3: Ensure 100% adherence to SOPs, control plans, and quality checkpoints.

KR4: Close ≥ 95% quality issues within agreed timelines.

Objective 4: Reduce Downtime & Improve Equipment Reliability

Key Results

KR1: Ensure 100% preventive maintenance compliance as per schedule.

KR2: Reduce unplanned machine downtime by 15–20%.

KR3: Support maintenance in RCA for all major breakdowns.

KR4: Achieve MTTR improvement of 10% for recurring issues.

Objective 1:



Achieve Daily Production Targets Safely & Consistently

Key Results

KR1: Achieve ≥ 98% daily production plan adherence.

KR2: Ensure zero production loss due to avoidable planning or execution gaps.

KR3: Maintain 100% shift handover accuracy and production reporting.

KR4: Resolve ≥ 95% shift issues within the same shift.

Objective 2: Improve Productivity & Line Efficiency

Key Results

KR1: Improve line efficiency / OEE to ≥ 85% for critical lines.

KR2: Reduce cycle time by 8–12% through line balancing and work optimization.

KR3: Eliminate top 3 bottlenecks identified each quarter.

KR4: Implement minimum 2 productivity improvement actions per quarter.

Objective 3: Ensure Product Quality & First-Time-Right Manufacturing

Key Results

KR1: Achieve First Pass Yield (FPY) ≥ 98%.

KR2: Reduce in-process defects and rework by 20–25%.

KR3: Ensure 100% adherence to SOPs, control plans, and quality checkpoints.

KR4: Close ≥ 95% quality issues within agreed timelines.

Objective 4: Reduce Downtime & Improve Equipment Reliability

Key Results

KR1: Ensure 100% preventive maintenance compliance as per schedule.

KR2: Reduce unplanned machine downtime by 15–20%.

KR3: Support maintenance in RCA for all major breakdowns.

KR4: Achieve MTTR improvement of 10% for recurring issues.

📌 Production Engineer/Sr.Engineer (Gurugram)
🏢 Eastman Auto u0026 Power
📍 Gurugram

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: production engineer/sr.engineer (gurugram) / gurugram

Subscribe to this job alert:

Get the latest job offers by email for: production engineer/sr.engineer (gurugram) / gurugram