23 Oct
|
Eastman Auto u0026 Power
|
Himachal Pradesh
23 Oct
Eastman Auto u0026 Power
Himachal Pradesh
High integrity & honesty
2.Reliability & Punctuality
Willingness to learn
4.Analytical Thinking & observation skill
5.Accountability ,Patience & discipline
Knowledge of inspection methods
7.Data collection & reporting skills
8.Ability to read drawing
Sampling of Plastic items, packing items, Separator, Gauntlet etc Inspection of Incoming raw material as per Control Plan.
( Plastic items , Separators , Gauntlet etc. ) Decision of Incoming material ( Accepted or Rejected ) based on Sampling Plan , MS & Drawing.
Preparation
Of IQC MIR ( with MIR Number) of each incoming material. Submittion of MIR copy to Store department on daily basis. To ensure IQC Accepted / Rejected tagging on IQC Accepted or Rejected material. Responsible to circulate mail to concern departments in case of any IQC Rejection. Responsible to maintain 5S & Safety standard at working place
📌 Iqc Engineer Himachal Pradesh
🏢 Eastman Auto u0026 Power
📍 Himachal Pradesh