23 Oct
|
Coreops.ai
|
India
Reengineering implementation of SAP PM for a leading utilities LNG organization in order to cover the below key requirements.
KEY REQUIREMENTS SCOPE OF WORKS :-
PM process re-engineering standardizations
Review and assess current SAP PM processes across plants ,refilling stations and logistic
Design standardized To-Be PM processes aligned with SAP best practices
Optimize Preventive, Corrective, and Breakdown Maintenance workflows
Standardize Notification and Work Order lifecycle management
Define maintenance planning, scheduling, and execution controls
Mater data system optimization
Re-structure Equipment and Functional Location hierarchy
Rationalize Task Lists, Maintenance Plans, and Maintenance Items
Align Bill of Maintenance (BoM), where applicable
Optimize PM integration touchpoints with MM for spares and procurement
Clean-up and standardization of PM master data (within agreed scope)
Reporting, Enablement Go-Live Support
Define and enable maintenance KPIs (MTTR, MTBF, backlog, compliance)
Standard SAP PM reports and operational dashboards
Standard SAP PM reports and operational dashboards
System testing support (Unit, Integration UAT)
End-user training and process documentation
GO-live Support to ensure smooth adoption
Scope of works
Assessment Problem Diagnosis
Freeze Stabilize Planning
Strategy Cleanup (Duplicate / Wrong Strategies)
Current Strategy Design (If required)
Maintenance Plan Re-design (Strategy-based plans)
Maintenance Plan Re-design (Time-based Single Cycle)
Maintenance Plan Re-design (Performance-based Single Cycle)
Task List Alignment Decision
Task List Standardization
Measuring Points Counters Correction
Measuring Documents Correction
Handling Existing Generated Orders (Mass Orders)
Can Maintenance Plan / Scheduled Order be Deleted?
Deletion Flags Retiring Old Plans
Production Cleanup Governance (No Direct Removal)
Re-Scheduling Validation
Upgrade of User Manuals
Training to Business Users
Authorization Matrix / Governance
Testing Sign-Off
To be covered across various factors ranging organizational structure (i.e Plants, Stations, Fleets Assets) where technial objects management and maintenance planning strategies in all aspects of PM module. i.e Maintenance Plan categories, Task lists to be used in maintenance plan of all equipments, General TLs , scheduling parameters. Setting up time-based, performance-based or strategy-based plans and
📌 Sap Plant Maintenance Noida (India)
🏢 Coreops.ai
📍 India