Electrical Engineer (Bhiwadi)

Electrical Engineer (Bhiwadi)

25 Oct
|
Wellcare Oil Tools
|
Bhiwadi

25 Oct

Wellcare Oil Tools

Bhiwadi

Role and Responsibilities of an Electrical Engineer in CNC and VMC Electrical Maintenance

1. CNC and VMC Machine Electrical Maintenance

- Perform daily, weekly, monthly, and preventive electrical maintenance of CNC and VMC machines.
- Inspect electrical panels, wiring, terminals, contactors, relays, MCBs, MCCBs, fuses, and power supplies.
- Check servo motors, spindle motors, servo drives, spindle drives, and feedback systems.
- Inspect cooling fans, panel air conditioners, filters, and electrical cabinet ventilation.
- Check machine earthing, grounding, cable insulation, and electrical connections.
- Ensure all electrical components operate according to manufacturer specifications.

2. CNC and VMC Machine Breakdown Troubleshooting

- Attend electrical breakdowns and restore machines safely within minimum downtime.
- Identify and troubleshoot faults related to:

- CNC controller alarms.
- Servo drive and spindle drive alarms.
- Axis movement and positioning problems.
- Machine reference return and homing issues.
- ATC (Automatic Tool Changer) electrical faults.
- Tool magazine and tool-change sequence problems.
- Limit switch, proximity sensor, and inductive sensor faults.
- Encoder, resolver, and feedback signal problems.
- Hydraulic and pneumatic solenoid valve control circuits.
- Coolant pump, lubrication pump, and chip conveyor electrical faults.
- Emergency stop circuits and machine interlocks.

- Analyze alarm history and electrical drawings to identify the root cause.
- Coordinate with mechanical, production, OEM, and service teams when required.

3. CNC Controller and Electrical Control Systems

- Maintain and troubleshoot CNC controllers such as FANUC, Siemens SINUMERIK, and other installed systems.
- Understand electrical ladder diagrams, control schematics, and PLC input/output signals.
- Monitor PLC inputs and outputs to identify sensor, actuator, and sequence-related faults.
- Troubleshoot 24 V DC control circuits and power supplies.
- Check communication between CNC controllers, PLCs, drives, and machine peripherals.
- Support parameter backup and restoration according to OEM procedures and authorization.
- Maintain records of CNC alarms, drive faults, and recurring electrical problems.

4. Servo Motor and Spindle Drive Maintenance

- Diagnose servo drive and spindle drive alarms.
- Check motor power cables, feedback cables, connectors, and grounding.
- Identify overcurrent, overvoltage, under voltage, overheating, and overload faults.
- Inspect servo motor brakes, cooling fans, and spindle cooling systems where fitted.
- Check drive cooling fans and heat sinks for dust accumulation.
- Coordinate servo motor, spindle motor, and drive repairs with authorized service providers.
- Verify machine operation and axis movement after repairs.

Important: Servo and spindle drive replacement, parameter changes, and motor feedback adjustments must follow the OEM procedure to prevent damage or loss of machine accuracy.

5. Preventive Maintenance (PM)

Frequency

Electrical maintenance activities

Daily

Check electrical alarms, abnormal noises, panel temperatures, machine status, and visible cable damage.

Weekly

Inspect panel filters, cooling fans, sensors, switches, connectors,



and cable routing.

Monthly

Inspect terminal tightness, earthing, cabinet cooling, drive condition, and electrical protection devices.

Quarterly

Conduct detailed electrical inspections, review recurring alarms, and assess critical components.

Half-yearly/Yearly

Perform a comprehensive electrical PM according to OEM recommendations, site procedures, and equipment condition.

Always isolate the power supply and follow the prescribed lockout/tagout (LOTO) procedure before opening or working on electrical equipment. Live measurements should only be performed by authorized, qualified personnel using appropriate safety precautions.

6. PLC, Sensors, and Machine Interlocks

- Troubleshoot PLC-controlled machine sequences.
- Check proximity sensors, limit switches, pressure switches, and position sensors.
- Verify ATC arm position, tool-clamp/unclamp signals, magazine indexing, and spindle orientation feedback.
- Check door interlocks, guard switches, emergency stops, and safety relays.
- Verify coolant level, lubrication level, hydraulic pressure, and pneumatic pressure signals.
- Ensure sensors are properly aligned and their signals reach the PLC or CNC controller.

7. Electrical Panel and Power Quality

- Inspect CNC electrical cabinets and power distribution systems.
- Check MCBs, MCCBs, contactors, overload relays, transformers, and SMPS units.
- Inspect terminal blocks, connectors, and wiring for overheating or discoloration.
- Check incoming voltage, phase imbalance, and supply interruptions where relevant.
- Monitor earthing and bonding arrangements.
- Investigate recurring electrical trips and control power failures.
- Ensure proper panel cooling and cleanliness.

8. Breakdown Analysis and Root Cause Analysis (RCA)

- Record breakdown time, fault description, cause, corrective action, and restoration time.
- Analyze recurring CNC and VMC electrical failures.
- Perform root cause analysis rather than repeatedly resetting alarms.
- Implement corrective and preventive actions to avoid repeat failures.
- Identify critical spare parts and recommend stocking levels.

9. Spare Parts and Maintenance Documentation

- Maintain inventory of critical electrical spares, such as:

- Proximity sensors and limit switches.
- Contactors, relays, MCBs, and fuses.
- 24 V DC power supplies.
- Cooling fans and panel filters.
- Servo drives, spindle drives, and encoder cables, as applicable.
- Solenoid coils, connectors, and control cables.

- Maintain electrical drawings, wiring diagrams, alarm lists, and maintenance history.
- Prepare daily breakdown reports, preventive maintenance reports, and monthly maintenance summaries.
- Coordinate with purchase and stores departments for spare availability.

10. Safety and Compliance

- Follow electrical safety procedures and LOTO.




- Verify emergency stop and machine safety interlock operation.
- Use suitable PPE and properly rated electrical test instruments.
- Never bypass safety circuits to maintain production.
- Ensure guards and safety devices are restored and tested after maintenance.
- Follow applicable electrical safety standards and company procedures.

Important Technical Skills Required

CNC Controller and PLC

FANUC, Siemens, : ladder logic monitoring; I/O diagnosis; alarm interpretation.

Servo and Spindle Drives

Drive alarms, motor feedback, encoder signals, overload faults, and cooling systems.

Machine Electrical Systems

Electrical drawings, control circuits, sensors, relays, contactors, interlocks, and 24 V DC systems.

Maintenance Management

Preventive maintenance, breakdown analysis, spare-parts planning, MTTR, MTBF, and downtime reduction.

Significant CNC/VMC Electrical Faults and Troubleshooting

Machine problem

Possible electrical cause

Machine not powering ON

Incoming supply, MCCB, control transformer, or power supply fault

Servo alarm

Servo drive fault, feedback cable issue, motor problem, or overload

Spindle not running

Spindle drive alarm, enable signal missing, or interlock active

Axis not moving

Servo ready signal missing, drive alarm, limit switch, or interlock

ATC not working

Sensor fault, solenoid output issue, PLC sequence, or interlock

Machine not homing

Reference switch, encoder signal, feedback issue, or parameter problem

Coolant pump not working

Motor overload, contactor fault, wiring issue, or PLC output problem

Repeated CNC alarms

Power supply instability, wiring fault, cooling problem, or component failure

Machine trips during operation

Overload, short circuit, drive fault, or supply disturbance

These are initial diagnostic possibilities, not definitive diagnoses. Always verify the actual alarm code, electrical schematic, and OEM troubleshooting instructions.

Key Performance Indicators (KPIs)

An electrical maintenance engineer may be evaluated on the following performance indicators:

- Machine availability: Percentage of scheduled time that machines are available for production.
- MTTR: Mean Time to Repair; average time required to restore equipment.
- MTBF: Mean Time Between Failures; average operating time between breakdowns.
- Breakdown downtime: Total production time lost due to electrical failures.
- Preventive maintenance compliance: Percentage of planned PM activities completed on time.
- Repeat breakdown rate: Number of recurring failures after repair.
- Safety compliance: Completion of required electrical safety checks and procedures.

Daily Work Schedule of a CNC/VMC Electrical Maintenance Engineer

Activity

Typical work

Shift start

Review pending breakdowns and machine status

Before production

Check alarms, electrical condition, and machine readiness

During production

Attend breakdowns and troubleshoot electrical faults

Planned maintenance

Perform scheduled PM and inspect critical components

Coordination

Work with production, mechanical maintenance, and OEM teams

Shift handover

Record pending faults, downtime, and corrective actions

End of shift

Update maintenance logs and report critical issues

📌 Electrical Engineer (Bhiwadi)
🏢 Wellcare Oil Tools
📍 Bhiwadi

Reply to this offer

Impress this employer describing Your skills and abilities, fill out the form below and leave Your personal touch in the presentation letter.

Subscribe to this job alert:

Get the latest job offers by email for: electrical engineer (bhiwadi) / bhiwadi