- Preparation HVAC Boq & Estimation.
- Preparation HVAC layout(Chilled water/VRV/Ducting)
- Preparation of Design Brief Report and Design Criteria for HVAC system.
- Familiar with ASHRAE, ISHRAE, LEED & NBC codes for HVAC design development.
- Preparation of Heat load/Cooling load summary for building for the selection of economical HVAC system based on building survey inputs.
- Review and Development of HVAC system design and selection of HVAC equipment economically.
- Preparation of Bill of quantities and budgetary cost estimate for HVAC System.
- Review and approval of shop drawings.
- Co Working Company Background
- 5+ Years Experience